Togel online resmi
  • situs judi slot online terpercaya 2020
  • slot online terpercaya
  • situs judi slot online terpercaya
  • Situs Judi Slot Online Gampang Menang Bonus New Member 100
  • Situs Judi Slot Online Gampang Menang
Project Consultants - MMRC
Skip to main content
  • Accessibility And Screen Reader Options
  • English
  • मराठी
  • हिन्दी

A A A

Homepage Logo Mumbai Metro Rail Corporation Ltd. (JV of Govt. of India and Govt. of Maharashtra)

mmrc

Search form
Home MMRC
  • Home
  • About MMRC
    • Know Your Metro
    • Our Vision, Mission & Values
    • Board of Directors
    • Key Management Team
    • Our Organization
    • Managing Director
    • Reports & Documents
    • MOA & AOA
    • Annual Report
  • Project
    • Project Route
    • Project Timeline
    • Project Funding
    • Illustrative Designs
    • Technology
    • Typical Utility Shifting Plan
    • Project Consultants
    • Benefits of Metro Line 3
    • Environmental Benefits
    • Rehabilitation & Resettlement (R&R)
      • FLGRC/SLGRC
      • Public Consultation
      • Final BSES
      • Lottery Result
      • Policy / Project Documents
      • In - situ R&R Office Address
      • BSES Survey Maps
      • Building wise Allotment List
      • Rehabilitation Building Occupation Certificate
    • Projects Reports & Documents
    • NOC
    • Notice
    • Typical Traffic Diversion Plan
  • People Connect
    • FAQ
      • FAQ on Kalbadevi & Girgaon
      • FAQ on Aarey
    • Facts Of Aarey
    • Quick Facts
  • Tenders
    • Civil
    • System
      • Electrical
      • Signalling & Telecom
      • Rolling Stock
      • IT
      • Depot (M&P)
    • Planning
    • Miscellaneous
    • Awarded Contracts
    • MMRC Contractors
    • eTender
    • EOI-MoHUA
  • Media
    • Gallery
      • Photo Gallery
      • Video Gallery
    • News
    • Newsletters
    • MD Speaks
    • Press Releases
    • Social Media
      • Facebook
      • Instagram
      • Twitter
      • Youtube
  • Careers
    • Recruitment
    • Internship Policy
  • RTI/Vigilance
    • RTI (GOI)
    • RTI (GOM)
    • RTI ACT 2005
    • RTI/SANAD
    • PIO/APIO
    • Vigilance
  • Contact Us
    • How to reach us
    • Compliance Officer & Company Secretary
  • Policies
Flash News
  • The MMRCL cautions one and all of Fake appointment letters for Metro-3 corridorThe MMRCL cautions one and all of Fake appointment letters for Metro-3 corridor
  • MMRC Control room numbers :- 9136805065 / 7506706477Pre-Bid Meeting of supply, delivery, plantation and maintenance of advance sized nursery grown trees in Mumbai, Pacakge-20
  • RFP for Preparation of Detailed Project Report for Direct Pedestrian Subway Connection Between Metro Line 3 Stations and Adjoining Developments RFP for Preparation of Detailed Project Report for Direct Pedestrian Subway Connection Between Metro Line 3 Stations and Adjoining Developments
  • MMRC calendar 2022 MMRC calendar 2022
  1. Home
  2. Project
  3. Project Consultants
MMRC logo

Project Consultants

MMRC

Mumbai Metro Rail Corporation has appointed the AECOM Asia led consortium (JV between Padeco, Japan, LBG Inc., USA and Egis Rail, France) as General Consultants for Mumbai Metro Line-3, on the 'Quality and Cost basis' in concurrence with JICA guidelines.

General Consultants are on board to assist MMRC in design, supervision, quality control, safety and contract management of the project. The overall scope of work for the General Consultants will be broadly as under:

  • Assist in evaluation of bids for civil works
  • Review and proof-checking of detailed designs
  • Prepare tender design and documents for procurement of track work, rolling stock, system components
  • Supervise construction including supply and installation
  • Supervise works and ensure safety, quality and environmental aspects
  • Commission of all system components
  • Test and commission the entire system
  • Preparation/finalization of operation and maintenance manuals
Maple Logo
MMRC

Recent News

mmrc
कुलाबा-वांद्रे-सीप्झ या मेट्रो 3 मार्गाचे काम संध्या वेगाने सुरू असून
+19 May 2022
मेट्रो 3 कॉरिडोर का 98.9% मार्ग त्यार
+09 May 2022
मेट्रो ३ टनलिंग का 99 प्रतिशत मार्ग तैयार
+09 May 2022
When will Metro work will end? Good news:73% of it is ready
+09 May 2022
मेट्रो लावणार एक हजार झारे
+13 Apr 2022
मेट्रो ३ के लिए 250 करोड़ मंजूर
+23 Mar 2022
Previous Pause Next
MMRC

About MMRC

  • Tenders
  • Project
  • News
  • Contact Us
  • eTender
MMRC

Helpful Information

  • Project Route
MMRC

Policy

  • MMRC Green Policy
  • Disclaimer
  • Privacy Policy
MMRC

Other Govt Sites

  • Govt of India
  • MoHUA
  • Indian Railways
  • Govt of Maharashtra
  • MMRDA
  • Other Metros
MMRC
  • mmrc
  • mmrc
  • mmrc
MMRC

MMRC © 2019. All rights are reserved.

  • mmrc
  • mmrc
  • mmrc
Top