Skip to main content
  • Accessibility And Screen Reader Options
  • English
  • मराठी
  • हिन्दी

A A A

Homepage Logo Mumbai Metro Rail Corporation Ltd. (JV of Govt. of India and Govt. of Maharashtra)

mmrc

Search form
Home MMRC
  • Home
  • About MMRC
    • Know Your Metro
    • Our Vision, Mission & Values
    • Board of Directors
    • Key Management Team
    • Our Organization
    • Managing Director
    • Reports & Documents
    • MOA & AOA
    • Annual Report
  • Project
    • Project Route
    • Project Timeline
    • Project Funding
    • Illustrative Designs
    • Technology
    • Typical Utility Shifting Plan
    • Project Consultants
    • Benefits of Metro Line 3
    • Environmental Benefits
    • Rehabilitation & Resettlement (R&R)
      • FLGRC/SLGRC
      • Public Consultation
      • Final BSES
      • Lottery Result
      • Policy / Project Documents
      • In - situ R&R Office Address
      • BSES Survey Maps
      • Building wise Allotment List
      • Rehabilitation Building Occupation Certificate
      • Public Notices
    • Projects Reports & Documents
    • NOC
    • Notice
    • Typical Traffic Diversion Plan
  • People Connect
    • FAQ
      • FAQ on Kalbadevi & Girgaon
      • FAQ on Aarey
    • Facts Of Aarey
      • Note On Aarey
      • MMRC Ad
    • Quick Facts
  • Tenders
    • Civil
    • System
      • Electrical
      • Signalling & Telecom
      • Rolling Stock
      • IT
      • Depot (M&P)
      • O & M
    • Planning
    • Miscellaneous
    • Awarded Contracts
    • MMRC Contractors
    • eTender
    • EOI-MoHUA
  • Media
    • Gallery
      • Photo Gallery
      • Video Gallery
    • News
    • Newsletters
    • MD Speaks
    • Press Releases
    • Social Media
      • Facebook
      • Instagram
      • Twitter
      • Youtube
  • Careers
    • Recruitment
    • Internship Policy
  • RTI
    • RTI (GOI)
    • RTI (GOM)
    • RTI ACT 2005
    • RTI/SANAD
    • PIO/APIO
  • Vigilance
    • Chief Vigilance Officer
    • Notice
    • Vigilance Awareness
  • Contact Us
    • How to reach us
    • Compliance Officer & Company Secretary
  • Policies
Flash News
MMRC

Flash News

एनसीपीएने नूतनीकरण केलेल्या दिलीप पिरामल आर्ट गॅलरीचे मेट्रो-३ वरील छायाचित्र प्रदर्शनासह शुभारंभ
NCPA inaugurates its Renovated Art Gallery with photo exhibition on Metro Line-3
Design, Manufacture, Supply, Installation, Testing & Commissioning of Lot I: Blow Down Plant along with Comprehensive Maintenance Service, and Lot II: Well Wagon, for Project “Mumbai Metro Line-3
Design, Manufacture, Supply, Installation, Testing & Commissioning of Lot I: Blow Down Plant along with Comprehensive Maintenance Service, and Lot II: Well Wagon, for Project “Mumbai Metro Line-3
“Design, Manufacture, Supply, Installation, Testing & Commissioning and Comprehensive Maintenance Service of Rail-cum-Road Diesel Shunter” for Project Mumbai Metro Line-3
मुं.मे.रे.कॉ. तर्फे "मराठी भाषा संवर्धन पंधरवडा" साजरा मराठी बोला, मराठीतच शिका, मराठी भाषा टिकवा - अभिनेते सुमित राघवन
Civil Maintenance Contract for R & R Sites, MMRCL Transit Office and Civil & Electrical Work at MMRCL Hallmark Business Plaza 2nd & 8th Floor Offices and other allied works under Mumbai Metro Line III of MMRCL.
मुं.मे.रे.कॉ.च्या वतीने ३००० झाडांचे मूळ जागी वृक्षारोपण मोहिमेला सुरूवात
MMRC begins In-situ plantation drive of 3,000 trees
Design, Manufacture, Supply, Installation, Testing & Commissioning and Comprehensive Maintenance Service of Rail-cum-Road Diesel Shunter” for Project Mumbai Metro Line-3
  1. Home
  2. About MMRC
  3. Managing Director
MMRC logo

Managing Director

MMRC

Mrs. Ashwini Bhide, IAS.

Managing Director, MMRC
Shri. SVR Srinivas, IAS

Mrs. Ashwini Bhide, an IAS officer from the batch of 1995 of Maharashtra cadre, is a post-graduate in English Literature from Pune University. She was ranked first among women candidates in Civil Service Examination in year 1995.

Ms Ashwini Bhide has helmed some of the most ambitious, complex and mega urban infrastructure projects in the city of Mumbai - Coastal Road project as AMC of BMC, Mumbai Metro Line 3 as MD of MMRC, Eastern Freeway, the elevated road to International Airport, several flyovers on major arterial roads and rail over bridges including Milan ROB as well as the first phase of Mumbai Monorail in her stint with MMRDA.

As Additional Municipal Commissioner of BMC, she heads departments such as Information Technology, Coastal Road Project, Fire Brigade & Rescue Operations, Education, Gardens, Zoo, Heritage Cell, Building Construction & Maintenance. She has been driving several IT initiatives at BMC in the recent years. She was also the Head of BMC’s COVID19 Response War Room where several digital initiatives were rapidly implemented, including the Daily Dashboards which were recognised at national as well as at international level. She has also spearheaded creation of several Miyawaki style urban dense forests across Mumbai.

In a career of 25+ years, Ms Ashwini Bhide has held key positions such as CEO in Zilla Parishad, Additional Divisional Commissioner, Joint Secretary to the Governor of Maharashtra, Additional Metropolitan Commissioner in MMRDA, Secretary in School Education and Sports and MD of MMRC ie Mumbai Metro Rail Corporation Ltd. She believes in the power of innovative, practical, scalable and sustainable solutions. Very early in her career, she saw the potential of simple, cost effective and rapidly implemented weirs to effectively drive water conservation, and basis the impact of her drive, the initiative came to be recognised as “Vanraai Bandhaare” at state level, benefiting several farmers and livestock.

Mrs. Bhide currently heads the Mumbai Metro Rail Corporation which is a 50:50 JV of GOI and GOM. Metro Rail Corporation is executing Colaba-Bandra-SEEPZ Metro Line 3. Mumbai Metro Line 3 is part of Mumbai Metro Master Plan (357 km network consisting 14 Metro corridors) prepared by Government of Maharashtra (GoM). Line 3 is 33.5 km long fully underground Metro corridor with 27 (26 Underground + 1 At grade) stations and connects major CBDs and employment centers, Domestic and International terminals of Airport and several areas, which are not served by Suburban Railways. It is expected to carry 17 lakh passengers per day. Over all estimated cost of the project is Rs. 23,136 crores, out of which Japan International Cooperation Agency (JICA) will provide a loan assistance of Rs. 13,235 crores. Project is scheduled to be completed in the year 2023-24

MMRC

Recent News

mmrc
सीप्झ ते कुलाबा डिसेंबरमध्ये धावणार मेट्रो
+21 Mar 2023
सीप्झ ते कुलाबा मेट्रोला डिसेंबर २०२३चा मुहूर्त
+21 Mar 2023
सीएसटी-वडाळा मेट्रो ११ साठीही हवे 'जायका' चे कर्ज
+20 Mar 2023
Mumbai Metro 3: Over 2,000 families rehabilitated so far
+20 Mar 2023
मेट्रोचा प्रवास सुरक्षितही होणार
+20 Mar 2023
तेजी से चल रहा है मेट्रो 3 कॉरिडोर का काम
+20 Mar 2023
Previous Pause Next
MMRC

About MMRC

  • Tenders
  • Project
  • News
  • Contact Us
  • eTender
MMRC

Helpful Information

  • Project Route
MMRC

Policy

  • MMRC Green Policy
  • Disclaimer
  • Privacy Policy
MMRC

Other Govt Sites

  • Govt of India
  • MoHUA
  • Indian Railways
  • Govt of Maharashtra
  • MMRDA
  • Other Metros
MMRC
  • mmrc
  • mmrc
  • mmrc
MMRC

MMRC © 2019. All rights are reserved.

  • mmrc
  • mmrc
  • mmrc
Top