61 | Construction of residential cum commercial high-rise building at Kalbadevi CS No. 662 and 1/662 of Bhuleshwar division for rehabilitation of Metro Line-3 Project Affected Persons of Kalbadevi and Girgaon. | Addendum No 1 | MMRC/Planning/NIT/K3/19/08 | 07/08/2019 | file |
62 | Invitation for Bids "Part Design, Procurement and Part Supply, Installation, Testing and Commissioning of Ballastless Track on the Mainline from Aarey station (excluded) until BKC station (included) and Ballasted Track in the area of at-grade Aaresy station and in the Depot area of Mumbai Metro Line 3 (Colaba-Bandra-Seepz) and Procurement and Supply Turnouts, Scissor Crossovers and Buffer Stops for the entire Mainline for Mumbai Metro Line 3 (Colaba-Bandra-Seepz) including Package 10B" | Notice 10C | MM3-CBS-TWK-03 | 31/07/2019 | file |
63 | Supply, Installation, Testing and Commissioning of 12 nos. of Lifts/Elevators (6nos. of 612Kg / 9Person, and 6nos. of 408Kg/6 Person) including 2 years AMC work at Rehabilitation site of Mumbai Metro Rail Corporation Limited at Building No. 10 A to F Wing (2 lifts in each wing) situated in HDIL Premier Compound, Kurla, Mumbai, Pincode:- 400070 | Corrigendum - 4 | MMRC/Planning/NIT/LiftsKurla/19/07 | 25/07/2019 | file |
64 | CONSTRUCTION OF RESIDENTIAL CUM COMMERCIAL HIGH-RISE BUILDING AT KALBADEVI ON CS NO.662 AND 1/662 OF BHULESHWAR DIVISION FOR REHABILATAION OF METRO LINE-3PAP’S AT KALBADEVI AND GIRGAON | Notice | MMRCL/Planning/NIT/K3/19/08 | 15/07/2019 | file |
65 | Supply, Installation, Testing and Commissioning of 12 nos. of Lifts/Elevators (6nos. of 612Kg / 9Person, and 6nos. of 408Kg/6 Person) including 2 years AMC work at Rehabilitation site of Mumbai Metro Rail Corporation Limited at Building No. 10 A to F Wing (2 lifts in each wing) situated in HDIL Premier Compound, Kurla, Mumbai, Pin code:- 400070 | Notice | MMRC/Planning/NIT/LiftsKurla/19/07 | 13/06/2019 | file |
66 | Maintenance Contract for Rehabilitation & Resettlement (R&R) sites and allied works under Mumbai Metro Line-III of MMRCL | Notice | MMRC/Planning/RandR/CivilMC/NIT/18/06 | 06/11/2018 | file |
67 | Design, Fabrication, Supply and Erection of Pre-Engineered Steel Buildings for Stabling Yards at Aarey Depot of Mumbai Metro Line-3 (Colaba-Bandra-SEEPZ) Project | Notice - 2nd call | MMRC/ML-3/Car Depot/PEB/2018 | 02/11/2018 | file |
68 | Invitation for Bids for “Part Design, Procurement and Supply, Installation, Testing and Commissioning of ballastless Track on theMainline from Aarey station (excluded) until BKC station (included) and ballasted Track in the area of at-grade Aarey Station and in the Depot area, excluding the procurement and supply of the rail Fastener System for Mainline of Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) | Notice 10A | MM3-CBS-TWK-02 | 28/09/2018 | file |
69 | Invitation for Bids for “Part Design, Procurement and Supply, Installation, Testing and Commissioning of ballastless Track on the Mainline from BKC station (excluded) to Cuffe Parade station (included) excluding the procurement and supply of Head Hardened rail 60 E1 (UIC 60), 1080 grade HH, Turnouts, Scissor Crossovers and Buffer Stops for Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) | Notice 10B | MM3-CBS-TWK-02 | 28/09/2018 | file |
70 | Design, Fabrication, Supply and Erection of Pre-Engineered Steel Buildings for Stabling Yards at Aarey Depot of Mumbai Metro Line-3 (Colaba-Bandra-SEEPZ) Project | Addendum No 1 | MMRC/ML-3/Car Depot/PEB/2018 | 14/09/2018 | file |