Skip to main content
  • Accessibility And Screen Reader Options
  • English
  • मराठी
  • हिन्दी

A A A

Homepage Logo Mumbai Metro Rail Corporation Ltd. (JV of Govt. of India and Govt. of Maharashtra)

mmrc

Search form
Home MMRC
  • Home
  • About MMRC
    • Know Your Metro
    • Our Vision, Mission & Values
    • Board of Directors
    • Key Management Team
    • Our Organization
    • Managing Director
    • Reports & Documents
    • MOA & AOA
    • Annual Report
  • Project
    • Project Route
    • Project Timeline
    • Project Funding
    • Illustrative Designs
    • Technology
    • Typical Utility Shifting Plan
    • Project Consultants
    • Benefits of Metro Line 3
    • Environmental Benefits
    • Rehabilitation & Resettlement (R&R)
      • FLGRC/SLGRC
      • Public Consultation
      • Final BSES
      • Lottery Result
      • Policy / Project Documents
      • In - situ R&R Office Address
      • BSES Survey Maps
      • Building wise Allotment List
      • Rehabilitation Building Occupation Certificate
      • Public Notices
    • Projects Reports & Documents
    • NOC
    • Notice
    • Typical Traffic Diversion Plan
  • People Connect
    • FAQ
      • FAQ on Kalbadevi & Girgaon
      • FAQ on Aarey
    • Facts Of Aarey
      • Note On Aarey
      • MMRC Ad
    • Quick Facts
  • Tenders
    • Civil
    • System
      • Electrical
      • Signalling & Telecom
      • Rolling Stock
      • IT
      • Depot (M&P)
      • O & M
    • Planning
    • Miscellaneous
    • Awarded Contracts
    • MMRC Contractors
    • eTender
    • EOI-MoHUA
  • Media
    • Gallery
      • Photo Gallery
      • Video Gallery
    • News
    • Newsletters
    • MD Speaks
    • Press Releases
    • Social Media
      • Facebook
      • Instagram
      • Twitter
      • Youtube
  • Careers
    • Recruitment
    • Internship Policy
  • RTI
    • RTI (GOI)
    • RTI (GOM)
    • RTI ACT 2005
    • RTI/SANAD
    • PIO/APIO
  • Vigilance
    • Chief Vigilance Officer
    • Notice
    • Vigilance Awareness
  • Contact Us
    • How to reach us
    • Compliance Officer & Company Secretary
  • Policies
Flash News
MMRC

Flash News

एनसीपीएने नूतनीकरण केलेल्या दिलीप पिरामल आर्ट गॅलरीचे मेट्रो-३ वरील छायाचित्र प्रदर्शनासह शुभारंभ
NCPA inaugurates its Renovated Art Gallery with photo exhibition on Metro Line-3
Design, Manufacture, Supply, Installation, Testing & Commissioning of Lot I: Blow Down Plant along with Comprehensive Maintenance Service, and Lot II: Well Wagon, for Project “Mumbai Metro Line-3
Design, Manufacture, Supply, Installation, Testing & Commissioning of Lot I: Blow Down Plant along with Comprehensive Maintenance Service, and Lot II: Well Wagon, for Project “Mumbai Metro Line-3
“Design, Manufacture, Supply, Installation, Testing & Commissioning and Comprehensive Maintenance Service of Rail-cum-Road Diesel Shunter” for Project Mumbai Metro Line-3
मुं.मे.रे.कॉ. तर्फे "मराठी भाषा संवर्धन पंधरवडा" साजरा मराठी बोला, मराठीतच शिका, मराठी भाषा टिकवा - अभिनेते सुमित राघवन
Civil Maintenance Contract for R & R Sites, MMRCL Transit Office and Civil & Electrical Work at MMRCL Hallmark Business Plaza 2nd & 8th Floor Offices and other allied works under Mumbai Metro Line III of MMRCL.
मुं.मे.रे.कॉ.च्या वतीने ३००० झाडांचे मूळ जागी वृक्षारोपण मोहिमेला सुरूवात
MMRC begins In-situ plantation drive of 3,000 trees
Design, Manufacture, Supply, Installation, Testing & Commissioning and Comprehensive Maintenance Service of Rail-cum-Road Diesel Shunter” for Project Mumbai Metro Line-3
  1. Home
  2. Media
  3. MD Speaks

MD Speaks

MMRC

Smt. Ashwini Bhide, IAS

Managing Director, Mumbai Metro Rail Corporation Ltd. (MMRCL)
Shri. SVR Srinivas, IAS

The Govt. of Maharashtra is committed to implement ‘Metro Rail Projects’ to improve traffic & transportation scenario in Mumbai Metropolitan Region(MMR).

Mumbai Metro Line 3 (MML-3) which is 33.5 km long fully underground corridor with 27 stations (26 underground & 1 at grade) connecting Colaba to SEEPZ via BKC is a part of “Mumbai Metro Master Plan” covering 9 corridors with 153 kms to be implemented in three phases. Mumbai Metro Rail Corporation (MMRC) has been constituted as a 50:50 Joint Venture (JV) between the Govt. of India (GOI) and Govt. of Maharashtra (GOM) and is responsible for the implementation of this project.

The objective of Metro is to provide a “Rail based Mass Rapid Transit Facility” to people residing in areas presently not connected by Suburban Rail System and to bring the Metro System within reach of 500 meters to 1 km.

The project has immense advantages for public such as:

  • Saving in travel time
  • Reduction in pollution
  • De-congestion of roads
  • Comfortable journey in air-conditioned environment
  • No road stress, significant saving of energy
  • Carbon neutral mode of transport
  • Connectivity to airport 6 CBDs, 30 educational institutes, 13 hospitals
  • Facility of escalators/lifts for senior citizen/differently abled
  • Safety of passengers with no trespassing due to platform screen doors

The project will have unique features such as:

  • Smart lighting based stations
  • Platform screen doors
  • Modern & energy efficient rolling stock
  • Station access controlled with AFC/smart cards etc.
  • State-of-the-art elevators/escalators
MMRC

Recent News

mmrc
मेट्रो ३ : रुळांचे ५८ टक्के काम पूर्ण
+27 Mar 2023
सहा महिन्यांत आरे कारशेड ५४% पूर्ण
+27 Mar 2023
एशिया में सबसे लंबी होगी भूमिगत मुंबई मेट्रो
+27 Mar 2023
मेट्रो 3 की पटरियों का काम 58 फीसदी पूरा
+27 Mar 2023
मेट्रो ३चा पहिला टप्पा वर्षभरात
+27 Mar 2023
BKC-Seepz run will start on Metro 3 in 2024: DCM
+26 Mar 2023
Previous Pause Next
MMRC

About MMRC

  • Tenders
  • Project
  • News
  • Contact Us
  • eTender
MMRC

Helpful Information

  • Project Route
MMRC

Policy

  • MMRC Green Policy
  • Disclaimer
  • Privacy Policy
MMRC

Other Govt Sites

  • Govt of India
  • MoHUA
  • Indian Railways
  • Govt of Maharashtra
  • MMRDA
  • Other Metros
MMRC
  • mmrc
  • mmrc
  • mmrc
MMRC

MMRC © 2019. All rights are reserved.

  • mmrc
  • mmrc
  • mmrc
Top