Skip to main content
  • Accessibility And Screen Reader Options
  • English
  • मराठी
  • हिन्दी

A A A

Homepage Logo Mumbai Metro Rail Corporation Ltd. (JV of Govt. of India and Govt. of Maharashtra)

mmrc

Search form
Home MMRC
  • Home
  • About MMRC
    • Know Your Metro
    • Our Vision, Mission & Values
    • Board of Directors
    • Key Management Team
    • Our Organization
    • Managing Director
    • Reports & Documents
    • MOA & AOA
    • Annual Report
  • Project
    • Project Route
    • Project Timeline
    • Project Funding
    • Illustrative Designs
    • Technology
    • Typical Utility Shifting Plan
    • Project Consultants
    • Benefits of Metro Line 3
    • Environmental Benefits
    • Rehabilitation & Resettlement (R&R)
      • FLGRC/SLGRC
      • Public Consultation
      • Final BSES
      • Lottery Result
      • Policy / Project Documents
      • In - situ R&R Office Address
      • BSES Survey Maps
      • Building wise Allotment List
      • Rehabilitation Building Occupation Certificate
      • Public Notices
    • Projects Reports & Documents
    • NOC
    • Notice
    • Typical Traffic Diversion Plan
  • People Connect
    • FAQ
      • FAQ on Kalbadevi & Girgaon
      • FAQ on Aarey
    • Facts Of Aarey
      • Note On Aarey
      • MMRC Ad
    • Quick Facts
  • Tenders
    • Civil
    • System
      • Electrical
      • Signalling & Telecom
      • Rolling Stock
      • IT
      • Depot (M&P)
      • O & M
    • Planning
    • Miscellaneous
    • Awarded Contracts
    • MMRC Contractors
    • eTender
    • EOI-MoHUA
  • Media
    • Gallery
      • Photo Gallery
      • Video Gallery
    • News
    • Newsletters
    • MD Speaks
    • Press Releases
    • Social Media
      • Facebook
      • Instagram
      • Twitter
      • Youtube
  • Careers
    • Recruitment
    • Internship Policy
  • RTI
    • RTI (GOI)
    • RTI (GOM)
    • RTI ACT 2005
    • RTI/SANAD
    • PIO/APIO
  • Vigilance
    • Chief Vigilance Officer
    • Notice
    • Vigilance Awareness
  • Contact Us
    • How to reach us
    • Compliance Officer & Company Secretary
  • Policies
Flash News
MMRC

Flash News

एनसीपीएने नूतनीकरण केलेल्या दिलीप पिरामल आर्ट गॅलरीचे मेट्रो-३ वरील छायाचित्र प्रदर्शनासह शुभारंभ
NCPA inaugurates its Renovated Art Gallery with photo exhibition on Metro Line-3
Design, Manufacture, Supply, Installation, Testing & Commissioning of Lot I: Blow Down Plant along with Comprehensive Maintenance Service, and Lot II: Well Wagon, for Project “Mumbai Metro Line-3
Design, Manufacture, Supply, Installation, Testing & Commissioning of Lot I: Blow Down Plant along with Comprehensive Maintenance Service, and Lot II: Well Wagon, for Project “Mumbai Metro Line-3
“Design, Manufacture, Supply, Installation, Testing & Commissioning and Comprehensive Maintenance Service of Rail-cum-Road Diesel Shunter” for Project Mumbai Metro Line-3
मुं.मे.रे.कॉ. तर्फे "मराठी भाषा संवर्धन पंधरवडा" साजरा मराठी बोला, मराठीतच शिका, मराठी भाषा टिकवा - अभिनेते सुमित राघवन
Civil Maintenance Contract for R & R Sites, MMRCL Transit Office and Civil & Electrical Work at MMRCL Hallmark Business Plaza 2nd & 8th Floor Offices and other allied works under Mumbai Metro Line III of MMRCL.
मुं.मे.रे.कॉ.च्या वतीने ३००० झाडांचे मूळ जागी वृक्षारोपण मोहिमेला सुरूवात
MMRC begins In-situ plantation drive of 3,000 trees
Design, Manufacture, Supply, Installation, Testing & Commissioning and Comprehensive Maintenance Service of Rail-cum-Road Diesel Shunter” for Project Mumbai Metro Line-3
  • NIT for Civil Maintenance Contract for R & R Sites AlIURCL TransL Office and Civil & Electrical Work at MARCI  NIT for Civil Maintenance Contract for R & R Sites AlIURCL TransL Office and Civil & Electrical Work at MARCI
  • (Addendum 1) Appointment of Consultant for Bid Process Management of Non-Fare Box Revenue Streams Addendum 1 'Appointment of Consultant for Bid Process Management of Non-Fare Box Revenue Streams for Mumbai Metro Line-3
  • NIT document for OCC Infrastructure and Maintenance Workshop shed at Aarey depot NIT document for OCC Infrastructure and Maintenance Workshop shed at Aarey depot
  • NIT document for OCC Infrastructure and Maintenance Workshop shed at Aarey depot NIT document for OCC Infrastructure and Maintenance Workshop shed at Aarey depot
  • (Addendum No 3) Rail-cum-Road Vehicle along with Rerailing-cum Rescue EquipmentRail-cum-Road Vehicle along with Rerailing-cum Rescue Equipment
  • (Response to Bid Queries (Set-1)) Service of Pit Jack, Mobile Jack, and Bogie Turn TableService of Pit Jack, Mobile Jack, and Bogie Turn Table
  • (Addendum No 1) Service of Pit Jack, Mobile Jack, and Bogie Turn TableService of Pit Jack, Mobile Jack, and Bogie Turn Table
  • (NIT) Modification and Upgradation of existing Oracle ERP Application & Database on Oracle Cloud Infrastructure including Support & Defect Liability Period (DLP)Modification and Upgradation of existing Oracle ERP Application & Database on Oracle Cloud Infrastructure including Support & Defect Liability Period (DLP)
  • (RFP) Appointment of Consultant for Bid Process Management of Non-Fare Box Revenue Streams(RFP) Appointment of Consultant for Bid Process Management of Non-Fare Box Revenue Streams
  • (Addendum No. 2) Design, Manufacture, Supply, Installation, Testing & Commissioning and Comprehensive Maintenance service of Automatic Train Wash plantDesign, Manufacture, Supply, Installation, Testing & Commissioning and Comprehensive Maintenance service of Automatic Train Wash plant
  • (Addendum No. 2) Design, Manufacture, Supply, Installation. Testing & Commissioning of Rescue vehicle (Addendum No. 2) Design, Manufacture, Supply, Installation. Testing & Commissioning of Rescue vehicle
  • Mmrcl invites sealed bids in accordance with Single Stage Two Cover bidding system from eligible bidders for Selection of a Banking partner for Transaction Acquiring, Card Issuing and AFC integration services Mmrcl invites sealed bids in accordance with Single Stage Two Cover bidding system from eligible bidders for Selection of a Banking partner for Transaction Acquiring, Card Issuing and AFC integration services
  • Selection of a Banking partner for Transaction Acquiring, Card Issuing and AFC integration services Selection of a Banking partner for Transaction Acquiring, Card Issuing and AFC integration services
  • Detailed NIT for Operations and Maintenance Services for Mumbai Metro Line-3 Detailed NIT for Operations and Maintenance Services for Mumbai Metro Line-3
  • Advertisement for Operations and Maintenance Services of Metro line -3  Advertisement for Operations and Maintenance Services of Metro line -3
  • Notice for Providing A/c & Non A/c Vehicles  Notice for Providing A/c & Non A/c Vehicles
  • Addendum No. 2 for Metro Line-3 (Colaba-Bandra-SEEPZ) Project Addendum No. 2 for Metro Line-3 (Colaba-Bandra-SEEPZ) Project
  • Tender for Automatic Train Wash Plant MMRC calendar 2022
  • Tender for Diesel Shunter MMRC calendar 2022
  • Tender for Rescue Vehicle MMRC calendar 2022
  • Tender for Lifting Jacks, Mobile Jacks & Turn Table Tender for Lifting Jacks, Mobile Jacks & Turn Table
  • MMRC to generate more than 200 crores over 5 years from Station naming rights for Mumbai Metro Line 3 Stations MMRC calendar 2022
  • MMRC-MML-3-About Train Trial Runs-August 2022 MMRC calendar 2022
  • Design, Manufacture, Supply, Installation, Testing , Commissioning & Comprehensive Maintenance Services of , A) Under floor Lifting , B) Mobile Jacks , C) Bogie turn Table MMRC calendar 2022
  • Design, Manufacture, Supply, Installation, Testing , Commissioning & Comprehensive Maintenance Services of , A) Under floor Lifting , B) Mobile Jacks , C) Bogie turn Table MMRC calendar 2022
  • Pre bid meeting for Design, fabrication, supply and erection of Pre-Engineered steel buildings for stabling shed-2 and station platform shed at Aarey depot of Mumbai Metro Line-3 (Colaba-Bandra-SEEPZ) Project MMRC calendar 2022
  • MMRC has invited Bids (through e-tendering process) from eligible Bidder(s), for “Carrying out Real Estate Market Assessment and Financial Feasibility for Properties in vicinity of Metro Line -3” on 16th September 2022 MMRC calendar 2022
  1. Home
  2. Package
  3. Weekly progress report for all
mmrc icon

Weekly progress report for all

MMRC

Updated as on: 23rd Aug 2017

Sr. No.Package NamePackage status
1

Procurement of Rolling Stock

  • i) Package 17
  • Bid for Pre-Qualification of applicants - opened on 20th June 2017
  • Evaluation is under process
2

Procurement of Depot Machine & Plant

  • ii) Package 9
  • Tender documents under preparation.

Updated as on: 31st May 2022

Sr. No

Nature of Work

Status

1

Barricading

100 % completed. In progress with the construction works.

2

Rehabilitation & Resettlement

Completed.

3

Traffic Diversion

Completed.

4

Geo-technical investigation

100% completed.

5

Building condition Survey

Completed.

6

Tunneling Progress

Science Museum- Worli (Tansa-1) – 1382/ 1382 rings has been erected. (100 % completed)

Science Museum- Worli (Tansa-2) – 1372 / 1372 rings has been erected. (100 % completed)

 

Science Museum-Mumbai Central (Tansa-2) – 1182 / 1308 rings has been erected. (90.36 % Completed)

Science Museum-Mumbai Central (Tansa-1) – 792 / 1303 rings has been erected. (60.78 % Completed)

7

Segment Production Progress

100 % of the total scope of permanent rings has been completed.

8

Secant Piling Progress

Station Box Area:

 

Mumbai Central – 100 % completed

Mahalaxmi – 100 % completed

Science Museum – 100 % completed

Acharya Atre Chowk –100 % completed

Worli – 100 % completed

9

Traffic Decking & King Posts

 

Mumbai Central –100 % has been completed.

Mahalaxmi – 100 % has been completed.

Acharya Atre Chowk- 100 % has been completed.

Worli – 100 % has been completed.

 

 

 

10

Excavation (Station Box)

Mumbai Central:

2,14,164 / 2,14,164  cu.m ( 100% ) has been completed.

 

Mahalaxmi:

1,66,229 / 1,66,229 cu.m ( 100%) has been completed.

 

Science Museum :

2,11,816 / 2,11,816 cu.m ( 100 %) has been completed.

 

Acharya Atre Chowk:

1,87,375 / 1,87,375  cu.m ( 100 % ) has been completed.

 

Worli:

1,77,370 / 1,77,370 cu.m ( 100% ) has been completed.

 

 

11

Base Slab Progress

Mumbai Central:

100 % of the total scope has been completed.

 

Mahalaxmi:

100% of the total scope has been completed.

 

Science museum:

100 % of the total scope has been completed.

 

Acharya Atre Chowk:

100 % of the total scope has been completed.

 

Worli:

100 % of the total scope has been completed.

 

12

Concourse Slab Progress

Mumbai Central:

100 % of the total scope has been completed.

 

Mahalaxmi:

100 % of the total scope has been completed.

 

Science museum:

100 % of the total scope has been completed.

 

Acharya Atre Chowk:

87 % of the total scope has been completed.

 

Worli:

98 % of the total scope has been completed.

 

 

13

Roof Slab Progress

 

Mumbai Central:

100 % of the total scope has been completed.

 

Mahalaxmi:

100 % of the total scope has been completed.

 

Science museum:

100 % of the total scope has been completed.

 

Acharya Atre Chowk:

58 % of the total scope has been completed.

 

Worli:

97 % of the total scope has been completed.

 

  14

Platform Slab Progress

Mumbai Central:

68 % of the total scope has been completed.

 

Mahalaxmi:

20 % of the total scope has been completed.

 

Science museum:

69 % of the total scope has been completed.

 

Acharya Atre Chowk:

39 % of the total scope has been completed.

 

Worli:

57 % of the total scope has been completed.

 

 

Updated as on: 29th Sep 2022

Sr. No.Nature of WorkStatus
1Tunneling & Segment Production Progress 

Wainganga-1

Drive-1 (From Pali ground to CSIA-T2) (UpLine) -

Completed 1262rmt, Made Breakthrough on 24/09/2018.

Drive-2 (From Pali Ground to SEEPZ) (UpLine)-

Completed1689rmt, Made Breakthrough on 27/09/2019.

Wainganga-2:

Drive-1 (From Sariputnagar Ramp to SEEPZ) (DownLine)-

Completed 568rmt, Made breakthrough on 26/12/2018

Drive-2 (From Pali Ground to SEEPZ) (DownLine)-

Completed 1675rmt, Made Breakthrough at MIDC station on 12/12/2019

Wainganga-3:

Drive-1 (From Pali Ground to CSIA-T2) (DownLine)-

Completed 1313rmt, Made breakthrough on 13/02/2019

Drive-2 (From Sariputnagar Ramp to SEEPZ) (UpLine)-

Completed 572rmt, Made breakthrough on 13/08/2019

Segment Production PRogress:

100% of total completed.

2Excavation 

Station Box area:

Marol Naka: 100% completed

MIDC: 100% completed

SEEPZ: 100% completed

Ramp: 100% completed (including Cut & Cover and shaft area) 

3Base Slab Progress 

Marol Naka: 100%  Completed 

MIDC: 100% Completed

SEEPZ: 100% Completed

 Concourse Slab

Marol Naka: 100% Completed

MIDC: 100% Completed

SEEPZ: 100% Completed

Roof Slab

Marol Naka: 100% Completed

MIDC: 100% completed

SEEPZ: 100% completed

Mezzanine slab

Marol Naka: 100% Completed

4Secant Piling Progress 

Marol Naka: 100% completed

MIDC: 100% completed

SEEPZ: 100% completed

Ramp: 100% completed (including Cut & Cover and shaft area)

5Rehabilitation & Resettlement 

_______

6Building condition Survey

Completed.

7Tree Cutting/transplantation

Marol: Tree Cutting: 7/9, Tree Transplantation: 42/50

MIDC: Tree Cutting: 9/11, Tree Transplantation: 90/130

SEEPZ: Tree Cutting: 9/12, Tree Transplantation: 84/115

 

8Traffic Diversion

Marol Naka: 100% Completed

MIDC: 100% Completed.

SEEPZ: 100% Completed.

9Geo-technical investigation

100% Completed

10Barricading

All the acquired area 100% barricaded.

11Civil station progress

a) Marol Naka -91.5%

b) MIDC -94.3%

c) Seepz-94.1%

Updated as on: 31st May 2022

Sr. No

Nature of Work

Status

1

Barricading

Handed over areas barricaded

2

Rehabilitation & Resettlement

Vidhan Bhavan Station:   Alternate eatery (Kutumbsakhi) has been occupied at new location.

Hutatma Chowk: Container placed at alternate location for Police Chowky. Electricity & water connection and signing of MoU awaited for shifting.

3

Traffic Diversion & Decking

Phase-1 Traffic Diversions implemented at all station locations

Cuffe Parade- Deck at service lane open to traffic

Vidhan Bhavan- Both decks at Free Press Journal Road open to traffic

Churchgate- Straight Deck and cross deck open to traffic.

Hutatma Chowk- Straight Deck open to traffic

Mid Shaft- Approval Awaited

4

Geo-technical investigation

Completed for all stations and alignment

5

Tree Cutting/transplantation

Cuffe Parade Station -

Scope:      (To be transplanted/to be cut)= 123 / 196

Completed:  ( transplanted/ cut )     = 120 / 190

Vidhan Bhavan Station - 

Scope:     (To be transplanted/to be cut)= 94 / 116

Completed: ( transplanted/ cut )     = 67/92

(All cutting/ transplantation completed as 23 trees are being saved)

Church Gate Station

Scope:      (To be transplanted/to be cut)= 47 /51

Completed:  ( transplanted/ cut )     =  40 / 38

(All cutting/ transplantation completed as 51 trees are being saved)

Hutatma Chowk Station

Scope:      (To be transplanted/to be cut)= 76 / 45

Completed:  ( transplanted/ cut )     =  44 / 43

(All cutting/ transplantation completed as 35 are being saved)

Mid Shaft

Scope:      (To be transplanted/to be  cut)= 03 / 05

Completed:  ( Transplanted/ cut )     =  02/ 03

6

Building condition Survey

100% completed

 

7

Tunneling Progress

TBM Ring Building(rmtr):

TBM1: Total completed: 2,926.5 Scope: 2,926.5(4 Breakthrough Over)

TBM2: Total completed: 2,939.3 Scope: 2,939.3 (4 Breakthrough Over)

First Stage Concrete:

TBM1: Total completed:2,910.4 Scope: 2,910.4(Started on 06/01/21 in SCP to SVB Upline, started on 05/02/21 in SVB to SCG Upline, started on 19/08/21 in SCG to SHC Upline, Started on 06/11/21 in SHC to CST Upline)

 

TBM2: Total completed: 2,919 Scope: 2939.3 (Started on 02/12/20 at SVB to SCG Downline; Started on 27/03/21 in SCP to SVB Downline, Started on 30/07/21 in SCG to SHC Downline)

 

NATM 1: Total completed: 199.12 Scope: 199.12 (Started on 03/04/21 at SCP NATM 1 Upline)

NATM 2: Total completed: 200.2 Scope: 200.2 (Started on 30/04/21 at SCP NATM 2 Downline)

8

Segment Production Progress

100% Complete (4,166 nos)

9

Secant Piling Progress

Cuffe Parade Station - Total completed -1,371; Scope –1,371(Only Station Box); Entry Exit: 347 out of 347 completed; Vent Shaft: 26 out of 26 completed.

Vidhan Bhavan Station - Total completed -1,897; Scope – 1,897 (Station Box Piling completed);
Ancillary Building – Total Completed – 77; Scope – 77

Church Gate Station - Total completed -1,406; Scope – 1,406
 Ancillary Building – Total Completed –185; Scope – 185

Hutatma Chowk Station - Total completed – 1,796; Scope – 1,796; Utility Gallery: 97 out of 160 completed.

Mid Shaft - Total completed – 172; Scope – 172 (Secant Piles)

                      Total completed – 50; Scope – 50 (ISMB Soldier Piles)

10

Excavation
(Station Box + Entry Corridors along with Column Drop, Sump, Haunch, Earthmat and Berm Deductions)

Cuffe Parade Station:  305265 cum. out of 3,06,750 cum.

Vidhan Bhavan Station:  217189.01 cum. out of 2,17,474 cum.

 

Churchgate Station:  207831.37 cum. out of 2,13,592 cum.

 

Hutatma Chowk Station:  178271.84 cum. out of 1,81,998 cum.

 

Mid Shaft: 13,724 cum. out of 13,724 cum.

11

Permanent Works

Permanent Base Slab:

  1. 9,875 sqmtr completed out of 9,875 sqmtr at Cuffe Parade
  2. 5,775 sqmtr completed out of 5,775 sqmtr at Vidhan Bhavan
  3. 6,321 sqmtr completed out of 6,321 sqmtr at Church Gate
  4. 4,641 sqmtr completed out of 4,641 sqmtr at Hutatma Chowk

Concourse Slab:

  1. 9,106 sqmtr completed out of 9,234 sqmtr at Cuffe Parade
  2. 5,287 sqmtr completed out of 5,318 sqmtr at Vidhan Bhavan (100% Completed, Only Temporary Openings Left)
  3. 5,789 sqmtr completed out of 5,915 sqmtr at Churchgate
  4. 4,001 sqmtr completed out of 4,251 sqmtr at Hutatma Chowk

 

 

Mezzanine/ Other Slab:

  1. 9,091 sqmtr completed out of 10,581 sqmtr at Cuffe Parade (Car Park Slab above concourse)
  2. 5,193 sqmtr completed out of 5,318 sqmtr at Vidhan Bhavan (100% Completed, Only Temporary Openings Left)
  3. 3,983 sqmtr completed out of 4,251 sqmtr at Hutatma Chowk

 

Roof Slab:

  1. 9,205 sqmtr completed out of 9234 sqmtr at Cuffe Parade
  2. 3,627 sqmtr completed out of 3752 sqmtr at Vidhan Bhavan (100% Completed, Only Temporary Openings Left)
  3. 5,804 sqmtr completed out of 5915 sqmtr at Churchgate
  4. 4,106 sqmtr completed out of 4251 sqmtr at Hutatma Chowk

 

Platform Slab:

  1. 3752 sqmtr completed out of 3752 sqmtr at Cuffe Parade
  2. 2,803 sqmtr completed out of 2,885 sqmtr at Vidhan Bhavan
  3. 2,972 sqmtr completed out of 3,250 sqmtr at Church Gate

12

NATM Tunnel (Heading)

Upline: Total Completed: 199.12m Scope: 199.12m

Downline: Total Completed: 200.20m Scope: 200.20m

SHC NATM PF: Total Completed: 257.50m Scope: 257.5m

13

NATM Tunnel (Benching)

Upline: Total Completed: 199.12m Scope: 199.12m

Downline: Total Completed: 200.20m Scope: 200.20m

SHC NATM PF: Total Completed: 257.5m Scope: 257.5m

14

NATM Tunnel (Secondary Lining)

Upline Invert: 199.12m completed out of 199.12m

Upline Overt: 199.12m completed out of 199.12m

Downline Invert: 200.0m completed out of 200.20m

Downline Overt: 200.2m completed out of 200.20m

SHC NATM PF Invert: Total Completed: 258m Scope: 257.50m

SHC NATM PF Overt: Total Completed: 73m Scope: 257.50m

Updated as on: 21st Jun 2022

Sr. No.Nature of WorkStatus
1Tunneling & Segment Production Progress CSIA T2 Metro Station
Tunnel CSIA T2 to Sahar Road Station (Downline):
Permanat Ring: Total Progress - 491, Scope - 491
Completed
Permanat Ring: Total Progress - 491, Scope - 491
Completed
Tunnel MVS to CSIA T1 (Upline):
Permanat Ring: Total Progress - 910, Scope - 910
Completed
Tunnel MVS to CSIA T1 (Downline):
Permanat Ring: Total Progress - 892, Scope - 892
Completed
Sahar Road Station to CSMIA
Domestic Airport Station (Downline)
Permanat Ring: Total Progress - 1080, Scope - 1080
Segment Production Progress:
Permanent Rings: Total progress - 4949, Scope - 4949
2Excavation CSIA T1 Metro station
 Total progress - 268971 Cum. Scope - 268471 Cum. (Work in progress)
Sahar road Station
Total progress - 322478 Cum. Scope - 322478 Cum. (Completed)
CSIA T2 Metro Station
Total progress - 468642 Cum. Scope - 468642 Cum. (Completed)
3Base Slab Progress CSIA T1 Metro station:
Base Slab Completed.
Concourse Slab:  Total progress - 196 m. Scope - 198 m. (Work in progress)
Concourse to Roof Slab:  Total progress - 370 m. Scope - 390 m. (Work in progress)
Roof Slab:  Total progress - 196 m. Scope - 198 m. (Work in progress)
CSIA T2 Metro Station: 
Base Slab Completed.
Concourse Slab:  Total progress - 311 m. Scope - 314 m. (Work in progress)
Concourse to Roof Wall:  Total progress - 499 m. Scope - 541 m. (Work in progress)
Roof Slab:  Total progress - 311 Cum. Scope - 314 m. (Work in progress)
Sahar Road Metro station: 
Base Slab Completed.
Concourse Slab:  Total progress - 220 m. Scope - 220 m. (Completed)
Concourse to Roof Slab:  Total progress - 328 m. Scope - 328  m. (Completed)
Roof Slab:  Total progress - 220 Cum. Scope - 220 m. (Completed)
4Secant Piling Progress CSIA T1 Metro station
Secant piles: Total progress - 808, Scope - 808
Micro piles: Total progress - 154, Scope - 154
Sahar road Station
Secant piles: Total progress - 1121, Scope - 1121
Subway secant piles: Total progress - 67, Scope - 67
CSIA T2 Metro Station
Secant piles: Total progress - 1298, Scope - 1298
5Rehabilitation & Resettlement ______
6Building condition SurveyPre-condition survey this week - 0
Total Progress - 60
Scope - 60
7Tree Cutting/transplantationCSIA T1 -  Total progress - 3 , Scope - 3 ,  Completed
Transplantation - 60 out of 112
Sahar Rorad - Total progress - 4 , Scope - 4 , Completed
Transplantation - 177 out of 226
CSIA T2 - Total progress - 0 , Scope - 0 , Completed
Transplantation -  4 out of 4 completed
8Traffic DiversionSAHAR ROAD STATION:
Road diversion: Stage-1 Completed
Subway completed
Sahar Shadow Road:
Commissioned on 27th July 2018.
Caping beam & Flood Wall: Completed
CSIA T2 Metro Station:
Internal Road: Completed.
Ancillary Works for TBM Launching: Completed
9Geo-technical investigationSAHAR Road Metro station
Completed
Sahar Road to International Station
CSIA T1 Metro Station
Completed
CSIA T2 Metro Station
Completed
10BarricadingSAHAR Road Metro station
All construction Works is going on within
secured barricading area .
CSIA T1 Metro station
Completed
CSIA T2 Metro station
Completed
Construction Depot JVLR (GI Sheets)
Completed

Updated as on: 07th Oct 2022

1. ITO Junction-BKC
LocationScope(No.) This WeekTotal Progress%CompletionRemarks
Decking Plate Erection-Phase 1550-550100%Completed
Decking Plate Erection-Phase 1550 -550100%Completed
2. Utility Diversion
2.1. Dharavi
Utility TypeTotal Scope (Rmt)This WeekTotal Progress% CompletionRemarks
450 mm Dia Water Line (Building side)332 -332100% Completed
SWD - 2200 X 2200 East155 -155100% Completed
900 mm Dia Water Line300 -300100% Completed
1200 mm SWD Building site300 -300100% Completed
5.2. BKC
900 mm Dia SWD – TATA Footpath165 -165100% Completed
600 mm Dia SWD – IT Junction210 -210100% Completed
SWD Line- 2m X 2m48 -48100% Completed
450mm Dia SWD- N. Shaft165 -165100% Completed
5.3. Vidyanagari
300 mm Dia Sewer Line (N. Shaft)325 -325100% Completed
SWD & Culvert205 -205100% Completed
600 mm Dia Pipeline(Phase 1)232 -232100% Completed
1200 mm Dia Pipeline245 -245100% Completed
5.4. Santacruz
600 mm Dia Sewer Line150 -150100% Completed
SWD Below flyover360 -360100% Completed
300mm Dia Sewer line280 -280100% Completed
5.5. MVS
1200 mm Water Line Diversion45 -45100% Completed
3. PILING
3.1. Dharavi
LocationTotal Scope (Nos)This WeekTotal Progress% CompletionRemarks
North Retrieval & Ancillary307-307100%Completed
Station Box779-779100%Completed
Decking Piles-King Post (Interconnection)52-52100% Completed
3.2. BKC
LocationTotal Scope (Nos)This WeekTotal Progress% CompletionRemarks
North Launching shaft180-180100% Completed
Station Box1155-1155100%Completed
South Launching185 -185100% Completed
Decking Piles6 -6100% Completed
Entry/Exit-15-19-East(E10)76-76100% Completed
Entry/Exit-15-19-East(E11)121 -121100% Completed
Entry/Exit-15-19-East(E05)292-22974%Ongoing
Entry/Exit-15-19-East(E02)176 -176100% Completed
Entry/Exit-38-40-East(E07)220-16213%Ongoing
Entry/Exit-11-13-East(E04)93 62628% Ongoing
3.3. Vidyanagri
LocationTotal Scope (Nos)This WeekTotal Progress% CompletionRemarks
North Launching shaft176 -176100% Completed
Station Box894 -894100% Completed
3.4. Santacruz
LocationTotal Scope (Nos)This WeekTotal Progress% CompletionRemarks
Secant pile585 -585100% Completed
Micro pile(station box)2182 -2182100% Completed
Secant pile-(ent/ext)-South Entry Exit163-163 100% Completed
Secant pile-(ent/ext)-North Entry Exit112 -112100% Completed
Entry - Exit (Micro Piles) Gr 07 (South West Entry Exit)465-465100%Completed
Entry - Exit (Micro Piles) Gr 17 (North West Entry Exit)469-469100%Completed
Entry - Exit (Secant Piles) Gr 07 (SW Entry Exit)252-252100% Completed
Entry - Exit (Micro Piles) Gr 17 (N-W Entry Exit)333-333100% Completed
3.5. MVS
Secant Pile184-184100%Completed
4. Capping Beam
4.1. Dharavi
LocationTotal ScopeThis WeekTotal Progress% CompletionRemarks
Station Box717-717100% Completed
4.2. BKC
North Launching Shaft133-133100%Completed
Station Box860-860100%Completed
South Launching Shaft109-109100%Completed
4.3. Vidyanagri
North Shaft110-110100%Completed
Station Box680-680100%Completed
4.4. Santacruz & MVS
Station Box-Santacruz560-560100% Completed
North E&E-Santacruz60-60100%Completed
Station Box-MVS110-110100%Completed
5. Excavation
LocationScopeThis WeekTotal Progress% CompletionRemarks
Station Box (Dharavi)179000-1,79,000100%Completed
Station Box (BKC)377624-3,77,624100%Completed
Station Box (Vidyanagri)161118-1,61,118100%Completed
Santacruz (Station box)104500-1,04,500100%Completed
Entry Exit (BKC)(EE02)4736-329068%Ongoing
Entry Exit-SSC (NWEE &SWEE)235781101970083%Ongoing
6. Permanent Works-Dharavi
LocationUOMScopeThis WeekTotal Progress% CompRemarks
Base SlabRmt250 M-250 M100%Completed
Concourse SlabRmt250 M-250 M100%Completed
Roof SlabRmt250 M-250 M100%Completed
Platform SlabRmt250 M- 250 M100%Completed
Pop up WallsRmt790 M507 M57.5%Ongoing
Pop up SlabNos10635%Ongoing
EE SlabsNos8663%Ongoing
Ancillary SlabsNos65.564%Ongoing
BackfillingCum389612252157%Ongoing
BlockworkCum133711102176%Ongoing
7. Permanent Works-BKC
LocationUOMScopeThis WeekTotal Progress% CompRemarks
Base SlabRmt474 M-474 M100%Completed
Concourse SlabRmt474 M-463 MM95%Ongoing
Roof SlabRmt474 M-445 M94%Ongoing
Platform SlabRmt674 M-655 M97%Ongoing
Pop up WallsRmt782 M439 M56%Ongoing
Pop up SlabNos11436%Ongoing
EE SlabsNos323.563%Ongoing
Ancillary SlabsNos4250%Ongoing
BackfillingCum97,13526,10026%Ongoing
BlockworkCum2,458122,26586%Ongoing
7
8. Permanent Works-Vidyanagari
LocationUOMScopeThis WeekTotal Progress% CompRemarks
Base SlabRmt250 M6242 M98%Ongoing
Concourse SlabRmt250 M238 M95%Ongoing
Roof SlabRmt250 M232 M93%Ongoing
Platform SlabRmt250 M227 M91%Ongoing
Pop up WallsRmt544 M507M84%Ongoing
Pop up SlabNos887%Ongoing
EE SlabsNos44100%Completed
Ancillary SlabsNos6591%Ongoing
BackfillingCum398481864344%Ongoing
BlockworkCum16764109564%Ongoing
9. Permanent Works-Santacruz
LocationUOMScopeThis WeekTotal Progress% CompRemarks
Base SlabRmt252 M252 M100%Completed
Concourse SlabRmt252 M252 M100%Ongoing
Roof SlabRmt252 M-252 M100%Ongoing
Platform SlabRmt252 M-242 M96%Ongoing
Plant Room Base SlabRmt91 M91100%Completed
Pop up WallsRmt773 M533M72%Ongoing
Pop up SlabNos9666%Ongoing
ShaftsNos9322%Ongoing
BackfillingCum279281046437%Ongoing
BlockworkCum1589590164%Ongoing
10. NATM: BKC South
ActivityScopeThis WeekTotal Progress% CompletionRemarks
Excavation-Heading153-153100%Completed
Excavation-Benching153-153100%Completed
Concreting-Invert153-153100%Completed
Concreting-Overt153-153100%Completed
Concreting-Invert8.3-  Ongoing
Concreting-Overt8.3-   
11. NATM: BKC North
ActivityScopeThis WeekTotal Progress% CompletionRemarks
Excavation-Heading153 153100%Completed
Excavation-Benching153 153100%Completed
Concreting-Invert153-153100%Completed
Concreting-Overt153-153100%Completed
12. NATM: SANTACRUZ (PLATFORM TUNNEL)
ActivityScopeThis WeekTotal Progress% CompletionRemarks
Excavation-Heading272 272100%Completed
Excavation-Benching272 272100%Completed
Concreting-Invert272-272100%Completed
Concreting-Overt272-272100%Completed
13. NATM: CROSS PASSAGES – (SBA to MVS)
ActivityScopeThis WeekTotal Progress% CompletionRemarks
CP – 5071-1100%Completed
CP – 5081-1100%Completed
CP – 5091-1100%Completed
CP – 5101-1100%Completed
CP – 5111-1100%Completed
CP – 5121-1100%Completed
NATM CP-011-1100%Completed
NATM CP-021-1100%Completed
NATM CP-031-1100%Completed
14. NATM: CROSS PASSAGES – (SBA to SDH)
ActivityScopeThis WeekTotal Progress% CompletionRemarks
CP – 5011 1100%Completed
CP – 5021 1100%Completed
CP – 5031 1100%Completed
CP – 5041 1100%Completed
CP – 5051 1100%Completed
CP – 5061 1100%Completed
15. NATM: CP – (SSC)
ActivityScopeThis WeekTotal Progress% CompletionRemarks
A11 1100%Completed
B11 1100%Completed
C11 1100%Completed
A21 1100%Completed
B21 1100%Completed
C21 1100%Completed
A41 1100%Completed
A51 1100%Completed
A61 1100%Completed
16. NATM: SANTACRUZ (Ventilation Tunnel)
ActivityScopeThis WeekTotal Progress% CompletionRemarks
Excavation-Heading23 23100%Completed
Excavation-Benching23 23100%Completed
Concreting-Invert23-23100%Completed
Concreting-Overt23-23100%Completed

Updated as on: 01st Jun 2022

 Sr. No.

Nature of Work

Project Status

1

Tunneling Works

  • TBM-1 _Drive 1  Nayanagar to Dadar (upline):
    • TBM Lowered on 21.09.17
    • Initial Drive Start on 06.11.17
    • Initial Drive Completed on 24.01.18
    • Main Drive started on 26.02.18
    • Rings Erected – 1779 / 1779 Nos   (100% completed)
    • Break Through completed on 31.01.19

 

  • TBM-2_Drive 1_ Nayanagar to Dadar (downline):
    • TBM Lowered on 18.10.17
    • Initial Drive Start on 03.12.17
    • Initial Drive Completed on 19.02.18
    • Main Drive started on 24.03.18
    • Rings Erected – 1766 / 1766 Nos    (100% completed)
    • Break Through completed on 31.01.2019

 

  • TBM-3_Drive 1_ Siddhivinayak to Worli (upline):
    • TBM Lowered on 19.06.18
    • Initial Drive Start on 14.07.18
    • Initial Drive Completed on 03.09.18
    • Main Drive Start on 10.10.18
    • Rings Erected – 931 / 931 Nos        (100% completed)
    • Break Through completed on 15.03.2019

 

  • TBM-3_Drive 2_ Siddhivinayak to Worli (downline):
    • TBM Lowered on 27.04.19
    • Initial Drive Start on 16.05.19
    • Initial Drive Completed on 27.06.19
    • Main Drive Start on 20.07.19
    • Rings Erected – 917 / 917 Nos          (100% completed)
    • Break Through completed on 16.03.2020

 

 

 

  • TBM-2_Drive 3_ Siddhivinayak to Dadar (upline):
    • TBM Lowered on 25.10.19
    • Initial Drive Start on 16.12.19
    • Initial Drive Completed on 19.01.20
    • Main Drive Start on 10.02.20
    • Rings Erected – 791 / 791 Nos           (100% completed)
    • Break Through completed on 05.10.2020

 

  • TBM-1_Drive 3_ Siddhivinayak to Dadar (downline):
    • TBM Lowered on 09.01.20
    • Initial Drive Start on 10.02.20
    • Initial Drive Completed on 09.03.20
    • Main Drive Start on 07.07.20
    • Rings Erected – 805 / 805 Nos           (100% completed)
    • Break Through completed on 06.12.2020

 

  • TBM-2_Drive 2_ Naya Nagar to Dharavi (downline):
    • TBM Lowered on 07.05.19
    • Initial Drive Start on 27.05.19
    • Initial Drive Completed on 27.06.19
    • Main Drive Start on 22.07.2019
    • Rings Erected – 421 / 421 Nos          (100% completed)
    • Break Through completed on 12.10.2019

 

  • TBM-1_Drive 2_ Naya Nagar to Dharavi (upline):
    • TBM Lowered on 17.06.19
    • Initial Drive Start on 28.07.19
    • Initial Drive Completed on 90.08.19
    • Main Drive Start on 21.09.2019
    • Rings Erected – 421 / 421 Nos          (100% completed)
    • Break Through completed on 21.11.2019
 

 

 

2

Station Works

  • Siddhivinayak Station
    • Pilling works 100% scope completed (1540 Nos /1540 Nos)
    • Excavation 2,34,804 Cum / 2,34,804 Cum (100% scope completed)
    • Base Slab – 252 Rm/ 252 Rm (100% completed)
    • Concourse Slab – 252 Rm / 252 Rm (100% completed)
    • Intermediate Slab – 252 Rm / 252 Rm (100% completed)
    • Roof Slab – 252 Rm / 252 Rm (100% completed)
    • Platform Slab – 252 Rm / 252 Rm (100% completed)

Entrances

  • E3 Entrance

Base Slab: 553 Sqm/553 Sqm (100% Completed)

Intermediate Slab: 628 Sqm/628 Sqm (100% Completed)

Roof Slab: 740 Sqm/740 Sqm (100% Completed)

  • E4 Entrance

Base Slab: 639 Sqm/639 Sqm (100% Completed)

Intermediate Slab: 662 Sqm/662 Sqm (100% Completed)

Roof Slab: 399 Sqm/399 Sqm (100% Completed)

  • E5 Entrance

Base Slab: 375 Sqm/375 Sqm (100% Completed)

Intermediate Slab: 238 Sqm/238 Sqm (100% Completed)

Roof Slab: 175 Sqm/175 Sqm (100% Completed)

  • E6 Entrance

Base Slab: 272 Sqm/272 Sqm (100% Completed)

Roof Slab: 206Sqm/206 Sqm (100% Completed)

  • E1 Entrance

Base Slab: 143 Sqm/143 Sqm (100% Completed)

Roof Slab: 212 Sqm/212 Sqm (100% Completed)

  • E2 Entrance

Base Slab: 65 Sqm/86.4 Sqm (75% Completed)

Roof Slab:61Sqm/61 Sqm (100% Completed)

 

  • Dadar Station 
    • Pilling works 1083 Nos / 1083 Nos Piles completed (100% completed)
    • King Post – 29 / 29 Nos (100% completed)
    • Decking works – 8467 / 8467 Sqm (100% completed)
    • Excavation – 171759 Cum / 171759 Cum (100% completed)
    • Base Slab – 324 Rm/ 324 Rm (100% completed)
    • Concourse Slab – 324 Rm/ 324 Rm (100% completed)
    • Roof Slab 324 Rm / 324 Rm (100% completed)
    • Platform Slab- 324m/324m (100% Completed)

Entrances

  • E1 Entrance

Base Slab: 80 Sqm/80 Sqm (100% Completed)

Roof Slab: : 67 Sqm/67 Sqm (100% Completed)

  • E2 Entrance

Base Slab (At Roof Level): 0 Sqm/119 Sqm (0% Completed)

Cover Slab: 0 Sqm/45Sqm (0% Completed)

  • E3 Entrance

Base Slab (At Roof Level): 20 Sqm/81 Sqm (25% Completed)

Slab B/w RL and GL: 20 Sqm/98Sqm (20.4% Completed)

  • E4 Entrance

Base Slab: 138 Sqm/155 Sqm (89% Completed)

Roof Slab: 98 Sqm/122Sqm (80% Completed)

  • E5 Entrance

Base Slab: 35 Sqm/35 Sqm (100% Completed)

Roof Slab: 32 Sqm/32 Sqm (100% Completed)

  • E6 Entrance

Base Slab: 0 Sqm/44 Sqm (0% Completed)

Roof Slab: 0 Sqm/27 Sqm (0% Completed)

  • E7 Entrance

Base Slab: 146 Sqm/146 Sqm (100% Completed)

Roof Slab: 0 Sqm/124 Sqm (0% Completed)

 

 

  • Sitladevi Station
    • Pilling works - 1026 Nos / 1026 Nos Piles (100% completed)
    • King Post – 21/21 Nos (100% completed)
    • Decking works – 6965 / 6965 Sqm (100% Completed)
    • Excavation – 158000 Cum / 158000 Cum (100% completed)
    • Base Slab – 244 Rm/ 244 Rm (100% completed)
    • Mezzanine Slab – 244 Rm / 244 Rm (100% completed)
    • Concourse Slab – 244 Rm/ 244 Rm (100% completed)
    • Roof Slab – 171 Rm/ 244 Rm (70% completed)
    • Platform Slab- 170 m/ 244 m (69.67% Completed)

Entrances

  • E1 Entrance

Base Slab: 180 Sqm/180 Sqm (100% Completed)

Roof Slab: 0 Sqm/150 Sqm (0% Completed)

Slab @ 2.4lvl: 0Sqm/279Sqm (0% Completed)

  • E2 Entrance

Base Slab: 176 Sqm/176 Sqm (100% Completed)

Cover Slab: 0 Sqm/27 Sqm (0% Completed)

  • E3 Entrance

Base Slab: 57 Sqm/57 Sqm (100% Completed)

Roof Slab: 0 Sqm/24 Sqm (0% Completed)

  • E4 Entrance

Base Slab: 121 Sqm/121 Sqm (100% Completed)

Roof Slab: 41 Sqm/41 Sqm (0% Completed)

  • E5 Entrance

Base Slab:86 Sqm/86 Sqm (100% Completed)

Plinth: 0 Sqm/18 Sqm (0% Completed)

  • Sitladevi Station NATM
    • NATM Platform Tunnel Excavation (Heading) – 244 Rm / 244 Rm (100% completed)
    • NATM Platform Tunnel Excavation (Benching) – 244 Rm / 244 Rm (100% completed)
    • NATM Platform Invert Lining – 244 Rm / 244 Rm (100% completed)
    • NATM Platform Overt Lining – 244 Rm / 244 Rm (100% completed)
 

 

3

Cross Passages

  • CP 16/17 – 01 (CP-03)
    • Excavation & Primary Support – 20.9 Rm / 20.9 Piles (100% completed)
    • Waterproofing – 20.9 Rm/20.9 Rm (100% completed)
    • Final Lining (Overt) – 20.9 Rm/20.9 Rm (100% completed)
    • Final Lining (Invert) – 20.9 Rm/20.9 Rm (100% completed)
  • CP 16/17 – 02 (CP-02)
    • Excavation & Primary Support – 21 Rm / 21 Piles (100% completed)
    • Waterproofing – 21 Rm/21 Rm (100% completed)
    • Final Lining (Overt) – 21 Rm/21 Rm (100% completed)
    • Final Lining (Invert) – 21 Rm/21 Rm (100% completed)
  • CP 16/17 – 03 (CP-01)
    • Excavation & Primary Support – 14.6 Rm / 14.6 Piles (100% completed)
    • Waterproofing – 14.6 Rm/14.6 Rm (100% completed)
    • Final Lining (Overt) – 14.6 Rm/14.6 Rm (100% completed)
    • Final Lining (Invert) – 14.6 Rm/14.6 Rm (100% completed)
  • CP 15/16 – 01 (CP-09)
    • Excavation & Primary Support – 7.3 Rm / 7.3 Piles (100% completed)
    • Waterproofing – 7.3 Rm/7.3 Rm (100% completed)
    • Final Lining (Overt) – 7.3 Rm/7.3 Rm (100% completed)
    • Final Lining (Invert) – 7.3 Rm/7.3 Rm (100% completed)
  • CP 15/16 – 02 (CP-08)
    • Excavation & Primary Support – 8 Rm/8 Piles (100% completed)
    • Waterproofing – 8 Rm/8 Rm (100% completed)
    • Final Lining (Overt) – 8 Rm/8 Rm (100% completed)
    • Final Lining (Invert) – 8 Rm/8 Rm (100% completed)

 

  • CP 15/16 – 03 (CP-07)
    • Excavation & Primary Support – 8.7 Rm/8.7 Piles (100% completed)
    • Waterproofing – 8.7 Rm/8.7 Rm (100% completed)
    • Final Lining (Overt) – 8.7 Rm/8.7 Rm (100% completed)
    • Final Lining (Invert) – 8.7 Rm/8.7 Rm (100% completed)

 

  • CP 15/16 – 04 (with sump) (CP-06)
    • Excavation & Primary Support – 9.4 Rm/9.4 Piles (100% completed)
    • Waterproofing – 9.4 Rm/9.4 Rm (100% completed)
    • Final Lining (Overt) – 9.4 Rm/9.4 Rm (100% completed)
    • Final Lining (Invert) – 9.4 Rm/9.4 Rm (100% completed)

 

  • CP 15/16 – 05 (CP-05)
    • Excavation & Primary Support – 20.5 Rm/20.5 Piles (100% completed)
    • Waterproofing – 20.5 Rm/20.5 Rm (100% completed)
    • Final Lining (Overt) – 20.5 Rm/20.5 Rm (100% completed)
    • Final Lining (Invert) – 20.5 Rm/20.5 Rm (100% completed)

 

  • CP 15/16 – 06 (CP-04)
    • Excavation & Primary Support – 20.9 Rm/20.9 Piles (100% completed)
    • Waterproofing – 20.9 Rm/20.9 Rm (100% completed)
    • Final Lining (Overt) – 20.9 Rm/20.9 Rm (100% completed)
    • Final Lining (Invert) – 20.9 Rm/20.9 Rm (100% completed)
  • CP 16/17 – 06  (CP-11)
    • Excavation & Primary Support – 10.6 Rm/10.6 Piles (100% completed)
    • Waterproofing – 10.6 Rm/10.6 Rm (100% completed)
    • Final Lining (Overt) – 10.6 Rm/10.6 Rm (100% completed)
    • Final Lining (Invert) – 10.6 Rm/10.6 Rm (100% completed)
  • CP 16/17 – 05 (CP-10)
    • Excavation & Primary Support – 9.6 Rm/9.6 Piles (100% completed)
    • Waterproofing – 9.6 Rm/9.6 Rm (100% completed)
    • Final Lining (Overt) – 9.6 Rm/9.6 Rm (100% completed)
    • Final Lining (Invert) – 9.6 Rm/9.6 Rm (100% completed)
  • CP 13/14 – 01 (CP-16)
    • Excavation & Primary Support – 10.3 Rm/10.3 Piles (100% completed)
    • Waterproofing – 10.3 Rm/10.3 Rm (100% completed)
    • Final Lining (Overt) – 10.3 Rm/10.3 Rm (100% completed)
    • Final Lining (Invert) – 10.3 Rm/10.3 Rm (100% completed)
  • CP 13/14 – 02 (CP-15)
    • Excavation & Primary Support – 9.6 Rm/9.6Piles (100% completed)
    • Waterproofing – 9.6 Rm/9.6 Rm (100% completed)
    • Final Lining (Overt) – 9.6 Rm/9.6 Rm (100% completed)
    • Final Lining (Invert) – 9.6 Rm/9.6 Rm (100% completed)
  • CP 13/14 – 03 (CP-14)
    • Excavation & Primary Support – 9.6 Rm/9.6 Piles (100% completed)
    • Waterproofing – 9.6 Rm/9.6 Rm (100% completed)
    • Final Lining (Overt) – 9.6 Rm/9.6 Rm (100% completed)
    • Final Lining (Invert) – 9.6 Rm/9.6 Rm (100% completed)
  • CP 13/14 – 04 (CP-13)
    • Excavation & Primary Support – 9.6 Rm/9.6 Piles (100% completed)
    • Waterproofing – 9.6 Rm/9.6 Rm (100% completed)
    • Final Lining (Overt) – 9.6 Rm/9.6 Rm (100% completed)
    • Final Lining (Invert) –9.6 Rm/9.6 Rm (100% completed)
  • CP 13/14 – 05 (CP-12)
    • Excavation & Primary Support – 10.5 Rm/10.5 Piles (100% completed)
    • Waterproofing – 10.5 Rm/10.5 Rm (100% completed)
    • Final Lining (Overt) – 10.5 Rm/10.5 Rm (100% completed)
    • Final Lining (Invert) – 10.5 Rm/10.5 Rm (100% completed)

4

Casting Yard at Wadala

  • Temporary Segments casted – 102 Nos /180 Nos
  • Sacrificial Segments casted – 510 Nos/ 2100 Nos
  • Permanent Segments casted– 46577 Nos / 46577 Nos (100% completed)
 

Updated as on: 09th Feb 2020

 Sr. No.Nature of WorkStatus
1Tunneling & Segment Production Progress

TBM - 1 Tunneling completed (TBM dismantalling in progress)

Temporary ring: Scope - 12 Completed

CST - SKD: Scope - 476 Completed

SKD - SGG: Scope - 499  Completed

SGG - SGR: Scope - 1,110 Completed

SGR - SMC: Scope - 635 Completed

TBM - 2

Temporary ring: Scope - 12 Completed

CST - SKD: Scope - 482 Completed

SKD - SGG: Scope - 488  Completed

SGG - SGR: Scope - 1,123 Completed

SGR - SMC: Total progress - 422, Scope - 639

Note:

TBM 2 stopped due to Parsi Fire Temple Issue on 20.07.2018 and resumed on 30.11.18

Second time stopped on 6.12.18 & resumed on 10.12.18

The productivity of TBM 2 is low due to unanticipated ground condition

Segment Production

Permanent Rings (including Upline & Downline)

SCS - SKD: Scope - 961 Completed

SKD - SGG: Scope - 713 Completed

SGG - SGR: Scope - 1,913 Completed

SGR - SMC: Scope - 991 Completed

Temporary Rings (including Upline & Downline)

SCS: Scope - 20 Completed

SKD: Scope - 277 Completed

SGG: Scope - 313 Completed

SGR: Scope - 287 Completed

2Excavation 

CST Station

Launching shaft: Scope - 25,859 Cum. Completed

Station Box (with extended concourse) - Scope - 1,26,691 Cum. Completed

Entry and Exit- Total Progress - 11,310 Cum. Scope - 29,956  Cum.

Grant Road

Station Box- Total Progress - 59,938 Cum. Scope - 1,03,536 Cum.

EE-1(Phase-02) - Total Progress - 8,829, Scope - 9,329

EE-2(Phase-05) - Total Progress - 2,364, Scope - 2,959

EE-3 (Phase-08) - Scope - 2,686

Girgaon

EE-2 (Swami Niwas) - Scope - 2,010

Station Box EE-3 (Extended conc.) -  Total Progress - 24,036, Scope - 1,39,980

Kalbadevi

Station Box- Total Progress

K-1 Box - Total Progress - 2,307, Scope - 26,621

K-2 Box -  Total Progress - 11,798, Scope - 52,000

3Base Slab Progress

CST

Station Box: Total Progress - 180, Scope - 250 

4Secant Piling Progress 

CST Station

Primary pile - Station Box: Scope - 359 Completed

Secondary pile Station Box: Scope - 352 Completed

Primary pile - Entry & Exit: Total progress - 620, Scope - 662

Secondary pile - Entry & Exit: Total progress - 628, Scope - 661

Grant Road Station

Primary pile: Total progress - 370, Scope - 371

Secondary pile: Scope - 373 Completed

Primary pile - Entry & Exit: Total progress - 53, Scope - 56

Secondary pile - Entry & Exit: Total progress - 48, Scope - 56

Girgaon Station

Primary pile Station Box: Scope - 353 Completed

Secondary pile Station Box: Total progress - 340, Scope - 345

Primary pile - Entry & Exit: Scope - 88 Completed

Secondary pile - Entry & Exit: Scope - 88 Completed

Kalbadevi Station K-2 Box

Primary Pile Station Box: Scope - 167 Completed

Secondary Pile Station Box: Scope - 167 Completed

Kalbadevi Station K-1 Box

Primary Pile Station Box: Scope - 96 Completed

Secondary Pile Station Box: Scope - 96 Completed

5Rehabilitation & Resettlement 

Rehabilitation & Resettlement is in progress.

Compensation meeting in progress with project affected residents in Kalbadevi and Girgaon.

6Building condition Survey

Pre - Condition Survey

Total Progress - 884

Scope - 1,004

Note: Additional 25M Topography survey on either of ZOI completed

7Tree Cutting/transplantation

CST - Total Progress - 47 , Scope - 91

CST - Transplantation - Total Progress - 62 , Scope - 97

Grant Road  - Total Progress - 28 , Scope - 28

Grant Road Transplantation - Total Progress - 21 , Scope - 21

Girgaon - Total Progress - 10 , Scope - 11

Girgaon Transplantation - Total Progress - 9 , Scope - 9

New Plantation at Aarey Colony  - Total Progress - 205 , Scope - 35

8 Traffic Diversion 

Permission for Traffic Diversion at Girgaon station received and  trial run road diversion started from 18th May 2017.

Trail run for traffic diversion at Grant road done on 20th July’2017 and road diversion started from 27th July’2017.

9Geo-technical investigation

Geo-technical investigation for Stations as well as Tunnel completed.

10Barricading

Barricading for CST Station Box, Wadala Casting Yard and WTC completed.

Barricading in Grant Road completed for Garden Side.

Structural Steel barricading for Median done at Grant Road.

Barricading in Girgaon completed for 619 RM out of 619 RM (Approx.)

Barricading in Kalbadevi station started as per land available on 29.09.18

MMRC

Recent News

mmrc
सीप्झ ते कुलाबा डिसेंबरमध्ये धावणार मेट्रो
+21 Mar 2023
सीप्झ ते कुलाबा मेट्रोला डिसेंबर २०२३चा मुहूर्त
+21 Mar 2023
सीएसटी-वडाळा मेट्रो ११ साठीही हवे 'जायका' चे कर्ज
+20 Mar 2023
Mumbai Metro 3: Over 2,000 families rehabilitated so far
+20 Mar 2023
मेट्रोचा प्रवास सुरक्षितही होणार
+20 Mar 2023
तेजी से चल रहा है मेट्रो 3 कॉरिडोर का काम
+20 Mar 2023
Previous Pause Next
MMRC

About MMRC

  • Tenders
  • Project
  • News
  • Contact Us
  • eTender
MMRC

Helpful Information

  • Project Route
MMRC

Policy

  • MMRC Green Policy
  • Disclaimer
  • Privacy Policy
MMRC

Other Govt Sites

  • Govt of India
  • MoHUA
  • Indian Railways
  • Govt of Maharashtra
  • MMRDA
  • Other Metros
MMRC
  • mmrc
  • mmrc
  • mmrc
MMRC

MMRC © 2019. All rights are reserved.

  • mmrc
  • mmrc
  • mmrc
Top