Skip to main content
  • Accessibility And Screen Reader Options
  • English
  • मराठी
  • हिन्दी

A A A

Homepage Logo Mumbai Metro Rail Corporation Ltd. (JV of Govt. of India and Govt. of Maharashtra)

mmrc

Search form
Home MMRC
  • Home
  • About MMRC
    • Know Your Metro
    • Our Vision, Mission & Values
    • Board of Directors
    • Key Management Team
    • Our Organization
    • Managing Director
    • Reports & Documents
    • MOA & AOA
    • Annual Report
  • Project
    • Project Route
    • Project Timeline
    • Project Funding
    • Illustrative Designs
    • Technology
    • Typical Utility Shifting Plan
    • Project Consultants
    • Benefits of Metro Line 3
    • Environmental Benefits
    • Rehabilitation & Resettlement (R&R)
      • FLGRC/SLGRC
      • Public Consultation
      • Final BSES
      • Lottery Result
      • Policy / Project Documents
      • In - situ R&R Office Address
      • BSES Survey Maps
      • Building wise Allotment List
      • Rehabilitation Building Occupation Certificate
      • Public Notices
    • Projects Reports & Documents
    • NOC
    • Notice
    • Typical Traffic Diversion Plan
  • People Connect
    • FAQ
      • FAQ on Kalbadevi & Girgaon
      • FAQ on Aarey
    • Facts Of Aarey
      • Note On Aarey
      • MMRC Ad
    • Quick Facts
  • Tenders
    • Civil
    • System
      • Electrical
      • Signalling & Telecom
      • Rolling Stock
      • IT
      • Depot (M&P)
      • O & M
    • Planning
    • Miscellaneous
    • Awarded Contracts
    • MMRC Contractors
    • eTender
    • EOI-MoHUA
  • Media
    • Gallery
      • Photo Gallery
      • Video Gallery
    • News
    • Newsletters
    • MD Speaks
    • Press Releases
    • Social Media
      • Facebook
      • Instagram
      • Twitter
      • Youtube
  • Careers
    • Recruitment
    • Internship Policy
  • RTI
    • RTI (GOI)
    • RTI (GOM)
    • RTI ACT 2005
    • RTI/SANAD
    • PIO/APIO
  • Vigilance
    • Chief Vigilance Officer
    • Notice
    • Vigilance Awareness
  • Contact Us
    • How to reach us
    • Compliance Officer & Company Secretary
  • Policies
Flash News
MMRC

Flash News

एनसीपीएने नूतनीकरण केलेल्या दिलीप पिरामल आर्ट गॅलरीचे मेट्रो-३ वरील छायाचित्र प्रदर्शनासह शुभारंभ
NCPA inaugurates its Renovated Art Gallery with photo exhibition on Metro Line-3
Design, Manufacture, Supply, Installation, Testing & Commissioning of Lot I: Blow Down Plant along with Comprehensive Maintenance Service, and Lot II: Well Wagon, for Project “Mumbai Metro Line-3
Design, Manufacture, Supply, Installation, Testing & Commissioning of Lot I: Blow Down Plant along with Comprehensive Maintenance Service, and Lot II: Well Wagon, for Project “Mumbai Metro Line-3
“Design, Manufacture, Supply, Installation, Testing & Commissioning and Comprehensive Maintenance Service of Rail-cum-Road Diesel Shunter” for Project Mumbai Metro Line-3
मुं.मे.रे.कॉ. तर्फे "मराठी भाषा संवर्धन पंधरवडा" साजरा मराठी बोला, मराठीतच शिका, मराठी भाषा टिकवा - अभिनेते सुमित राघवन
Civil Maintenance Contract for R & R Sites, MMRCL Transit Office and Civil & Electrical Work at MMRCL Hallmark Business Plaza 2nd & 8th Floor Offices and other allied works under Mumbai Metro Line III of MMRCL.
मुं.मे.रे.कॉ.च्या वतीने ३००० झाडांचे मूळ जागी वृक्षारोपण मोहिमेला सुरूवात
MMRC begins In-situ plantation drive of 3,000 trees
Design, Manufacture, Supply, Installation, Testing & Commissioning and Comprehensive Maintenance Service of Rail-cum-Road Diesel Shunter” for Project Mumbai Metro Line-3
  1. Home
  2. People Connect
  3. Social Media
MMRC logo

Social Media

MMRC
MMRC
  • New Austrian Tunnelling Method (NATM) enables the rock surrounding the tunnel to support itself.
  • Tunnel Boring Machine (TBM) makes a project more efficient.
  • New Austrian Tunnelling Method (NATM) offers sophisticated precision measurements.
  • Passenger Information Display System.
  • Shotcrete Protection To prevent rock loosening & deformation
  • New Austrian Tunnelling Method (NATM) creates a natural ring-like support structure around the tunnel
  • When you travel by Metro rail, you help reduce carbon dioxide emmission
  • Using energy efficient equipments equals saving energy.
  • The right Telecom systems. To serve all your needs.
  • Metro runs on Electricity, but also generates electricity.
  • A trip by metro, reduces pollution.
  • A lift that lifts, and consumes less energy.
  • Passenger announcement system more information helps in better travel
  • CCTV system will have real time surveillance ensuring public safety and security
  • Being future ready with optical fibre system.
  • State of the art telecommunication system.
  • Say no to pollution by travelling in metro.
  • Reduction in pollution reduction infuel consumption reduction in travel time
  • Reduction in emmission of harmful greenhouse gases.
  • Utilising Natural Light To Save Energy.
  • Light weight material Coaches For Low Energy Consumption
  • Infrared Sensors To Automatically To Reduce Speed
  • The proposed Modern Rolling stock will provide the benefits of low specific enegy consumption and almost unity power factor.
  • Rolling stock would have regenaration features embedded within.
  • Special access gates will be designed for “Differently Abled Passengers”
  • Lifts will be capable of carrying minimum loading of 1000 kg
  • Escalators will be provided with Modern & Energy friendly measures
  • Capacity of the proposed Ticket Vending Counters at the station will be minimum 5 passengers per minute
  • MMRC endeavors towards delivering the Best Quality Standard, meeting national as well as international standards
  • Platform length proposed for the Metro 3 station will have the capacity of 8 cars trains
  • Station Entrances will provide maximum space for smooth passenger flow & emergency evacuation
  •  MMRC plans to move on the path of MAKE IN INDIA
  • MMRC project activities are always in the interest of public
  •  MMRC abides by ethical standards, integrity & exhibit professionalism in each of its business
  • MMRC ensures special attention to senior citizens, women, children & differently abled people. #MMRCMission
  • MMRC envisions to become a self-reliant organization.
  • Reliable & Energy Efficient Power Supply System for MML3 corridor
  • Use of efficient 25 kv AC Propulsion System Technology for Metro Cars
  • MMRC aspirs to earn a prominent place in the MRT sector
  • Flexibility to Meet Increase in Traffic Demand
  • Lightweight Equipment & Coach Body
  • MMRC intends to serve all its stakeholders with pride, perfection & dignity
  • Aesthetically Pleasing Interior & Exterior
  • MMRC wishes to sustain 'We mean business' culture
  • Optimised Schedule Speed
  • Tunnel ventilation and station air conditioning (vac) system
  • MMRC strives to maintain a clean, secure and safe working environment for people involved in metro project.
  • MMRC is foucsed on building a Green, Eco-friendly and Energy efficient metro rail network
  • Mumbai Central Metro will address the travelling issues of numerous passengers coming in and out of Mumbai Central Railway everyday
  • Hutatma Chowk Metro will alleviate the commuting stress of people going towards Fort & surrounding areas in South Mumbai
  • MMRC aims to provide quality services to Mumbaikars ensuring fast, safe & comfortable commuting experience within the city
  • New Austrian Tunneling Method(NATM)
  • Tunnel Boring Machine(TBM)
  • Smart Lighting and Smart Air-conditioning
  • Automatic Fare Collection System
  • Platform Screen Doors
  • Always Stay Connected
  • Colaba/Cuffe Parade Metro Station proposed near the glorious World Trade Centre will bring closer the prestigious estated of Mumbai
  • World class subway system
  • Vidhan Bhavan Metro Station will provide a direct connectivity to Mantralaya, Vidhan Bhavan & New Administrative Building
  • Churchgate Metro Station planned near the iconic Eros Cinema will link major recreational areas of Mumbai
  • Use of smart technology for the smart city
  • High Commuting Cost Low Commuting Cost
  • Crowded Mode Comfortable Mode
  • Mumbai Metro revolutionises the way we commute! Come be the part of Change of Speed with Ease
  • Closed doors and continuous surveillance makes Mumbai Metro 3 a safe and secure transport system
  • Pollution free environment made possible for Mumbaikar's Courtesy- Mumbai Metro 3
  • BKC Metro Station in Metro Line III will provide improved access to BKC area offices
  • Worli Metro Station will become an important travel landmark resolving commuting woes of people residing in Mumbai
  • CST Metro Station will integrate with the existing infrastructure and make commute easier within the city
  • Win Win for all! Land restoration is assured after the completion of Mumbai Metro 3 project
  • Tired of honking while commuting? Not anymore with clean and noise-free metro journey
  • Smooth commuting from Colaba to Bandra in less than an hour!
  • New employment opportunities with Mumbai Metro 3
  • Mumbai Metro 3 will bring down fuel consumption considerably in near future
  • MMRC to use state of the art technology for cut & cover and NATM Stations
  • Metro 3 will reduce the burden on the Suburban Railway by 25%
  • Faster Means of Transport
  • Whizzing from colaba to seepz in one hour
  • Smart mobility era begins with mumbai metro 3 project harmoniusly connecting the east with the west of the island city
  • Reach maximum economics hubs in the mega city
  • Peaceful Journey
  • One of the most comfortable journey at your doorstep
  • Mumbai Metro 3 towards the new era
  • Metro 3 will reduce congestion on the roads of mumbai by 25%
  • Maas transit designed for the 21st century
  • A look back at our Achievements in 2015
  • Stress Free Travelling
  • Pollution Free Travelling
  • Hassel Free Travelling
  • Connecting Mumbai 8
  • Connecting Mumbai 7
  • Connecting Mumbai 6
  • Connecting Mumbai 5
  • Connecting Mumbai 4
  • Connecting Mumbai 3
  • Connecting Mumbai 2
  • Connecting Mumbai 1
  • Campaign 5
  • Campaign 4
  • Campaign 3
  • Campaign 2
  • Campaign 1
MMRC

Recent News

mmrc
सीप्झ ते कुलाबा डिसेंबरमध्ये धावणार मेट्रो
+21 Mar 2023
सीप्झ ते कुलाबा मेट्रोला डिसेंबर २०२३चा मुहूर्त
+21 Mar 2023
सीएसटी-वडाळा मेट्रो ११ साठीही हवे 'जायका' चे कर्ज
+20 Mar 2023
Mumbai Metro 3: Over 2,000 families rehabilitated so far
+20 Mar 2023
मेट्रोचा प्रवास सुरक्षितही होणार
+20 Mar 2023
तेजी से चल रहा है मेट्रो 3 कॉरिडोर का काम
+20 Mar 2023
Previous Pause Next
MMRC

About MMRC

  • Tenders
  • Project
  • News
  • Contact Us
  • eTender
MMRC

Helpful Information

  • Project Route
MMRC

Policy

  • MMRC Green Policy
  • Disclaimer
  • Privacy Policy
MMRC

Other Govt Sites

  • Govt of India
  • MoHUA
  • Indian Railways
  • Govt of Maharashtra
  • MMRDA
  • Other Metros
MMRC
  • mmrc
  • mmrc
  • mmrc
MMRC

MMRC © 2019. All rights are reserved.

  • mmrc
  • mmrc
  • mmrc
Top