361 | Mumbai Metro Rail Corporation (MMRC) Ltd. Invites online open e-tenders from from eligible agencies for Consultancy Services for Preparation of Detailed Project Report (DPR), Bid preparation, Design Proof checking, for proposed Multi-Level Underground Car Park (for about 700 cars) project in Mantralaya compound, at Nariman Point, Mumbai. | RFP | MMRC/MML-3/ car park Mantralaya/NIT/2019 | 20/11/2019 | file |
362 | Supply, Installation, Testing, Integration, Commissioning and Support of Common Asset Management System (CAMS) for Mumbai Metro Line 3 (MML3) | Corrigendum 3 | PRO/MMRC/56 | 18/11/2019 | file |
363 | Design, Manufacture, Supply, Installation, Testing & Commissioning of A) Synchronized Under Floor Lifting System, B) Synchronized Mobile Lifting Jacks and C) Bogie Turn Tables | Addendum No 2 | MM3-CBS-DEQ-9-05 | 18/11/2019 | file |
364 | Supply, Installation, Testing, Integration, Commissioning and Support of Common Asset Management System (CAMS) for Mumbai Metro Line 3 (MML3) | Addendum No 3 | PRO/MMRC/56 | 08/11/2019 | file |
365 | Design, Manufacture, Supply, Installation, Testing & Commissioning of Rescue Vehicle (Rail-cum-Road Vehicle with Re-Railing & Rescue Equipment) | Addendum No 2 | MM3-CBS-DEQ-9-04 | 08/11/2019 | file |
366 | Design, Manufacture, Supply, Installation, Testing & Commissioning of Rescue Vehicle (Rail-cum-Road Vehicle with Re-Railing & Rescue Equipment) | Response to Bid Queries (Set-2) | MM3-CBS-DEQ-9-04 | 08/11/2019 | file |
367 | Construction of Secant piling, slope protection and excavation works for Shunting Tracks area, at Ramp of car depot for Mumbai Metro Line-3 (Colaba-Bandra Seepz) Project. | Addendum No 1 | MML-3-CBS-DPT-SP | 06/11/2019 | file |
368 | Construction of Secant piling, slope protection and excavation works for Shunting Tracks area, at Ramp of car depot for Mumbai Metro Line-3 (Colaba-Bandra Seepz) Project. | Corrigendum - 1 | MML-3-CBS-DPT-SP | 06/11/2019 | file |
369 | EOI for Direct Access to MML3 Stations - MML3 alignment & station locations | | MMRC/Planninng | 01/11/2019 | file |
370 | EOI for Direct Access to Mumbai Metro Line 3 Stations - Notice | Notice | MMRC/Planning | 01/11/2019 | file |