561 | Procurement, Supply, Installation, Testing and Commissioning of various Power Supply works including associated Civil works, required for diversion of 220 kV and 33 kV Transmission Lines along with the Transmission towers belonging to M/s Reliance Infrastructure Ltd. in Aarey depot area for Mumbai Metro Line -3 | Addendum No 5 | MM3-CBS-REL-PYL | 16/06/2017 | file |
562 | Providing various types of Vehicles on monthly rental basis | Corrigendum 3 | MMRC/Admin/e-Tender/Vehicle/2017 | 16/06/2017 | file |
563 | RFP for Architectural, Structural Design and Project Management Consultancy Services for the redevelopment of project affected buildings at Kalbadevi & Girgaon stations on Mumbai Metro Line 3. | RFP | MMRC/Planning/PIU/KG3 | 07/06/2017 | file |
564 | Notice for Architectural, Structural Design and Project Management Consultancy Services for the redevelopment of project affected buildings at Kalbadevi & Girgaon stations on Mumbai Metro Line 3. | Notice | MMRC/Planning/PIU/KG3 | 07/06/2017 | file |
565 | Public Appeal | Public Appeal | MMRDA/MMRC | 01/06/2017 | file |
566 | Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing and Commissioning of Rolling Stock. | Pre-Bid Query Response | MM3-CBS-RS | 31/05/2017 | file |
567 | Procurement, Supply, Installation, Testing and Commissioning of various Power Supply works including associated Civil works, required for diversion of 220 kV and 33 kV Transmission Lines along with the Transmission towers belonging to M/s Reliance Infrastructure Ltd. in Aarey depot area for Mumbai Metro Line -3 | Addendum No 4 | MM3-CBS-REL-PYL | 29/05/2017 | file |
568 | Procurement, Supply, Installation, Testing and Commissioning of various Power Supply works including associated Civil works, required for diversion of 220 kV and 33 kV Transmission Lines along with the Transmission towers belonging to M/s Reliance Infrastructure Ltd. in Aarey depot area for Mumbai Metro Line -3 | Addendum No 3 | MM3-CBS-REL-PYL | 26/05/2017 | file |
569 | Notice is hereby given to general public that Mumbai Metro Rail Corporation proposes to acquire properties described in following schedule for the public purpose of Metro Line 3 (Colaba-Bandra-Seepz) | Notice | MMRDA/MMRC | 19/05/2017 | file |
570 | Invitation for Prequalification of bidders for Design, Manufacture, Supply, Installation, Testing and Commissioning of Rolling Stock. | Addendum No 17 | MM3-CBS-RS | 18/05/2017 | file |