Skip to main content
High Contrast
Standard Contrast
English
मराठी
हिन्दी
A
A
A
Mumbai Metro Rail Corporation Ltd.
(JV of Govt. of India and Govt. of Maharashtra)
mmrc
Search form
Search
MMRC
Search
MMRC
Toggle navigation
Home
About MMRC
Know Your Metro
Our Vision, Mission & Values
Board of Directors
Key Management Team
Our Organization
Managing Director
Reports & Documents
MOA & AOA
Annual Report
Project
Project Route
Project Timeline
Project Funding
Illustrative Designs
Technology
Typical Utility Shifting Plan
Project Consultants
Benefits of Metro Line 3
Environmental Benefits
Rehabilitation & Resettlement (R&R)
FLGRC/SLGRC
Public Consultation
Final BSES
Lottery Result
Policy / Project Documents
In - situ R&R Office Address
BSES Survey Maps
Building wise Allotment List
Rehabilitation Building Occupation Certificate
Public Notices
Projects Reports & Documents
NOC
Notice
Typical Traffic Diversion Plan
People Connect
FAQ
FAQ on Kalbadevi & Girgaon
FAQ on Aarey
Facts Of Aarey
Note On Aarey
MMRC Ad
Quick Facts
Tenders
Civil
System
Electrical
Signalling & Telecom
Rolling Stock
IT
Depot (M&P)
O & M
Planning
Miscellaneous
Awarded Contracts
MMRC Contractors
eTender
eTender - CPPP
EOI-MoHUA
Media
Gallery
Photo Gallery
Video Gallery
News
Newsletters
MD Speaks
Press Releases
Social Media
Facebook
Instagram
Twitter
Youtube
Careers
Recruitment
Internship Policy
RTI
RTI (GOI)
RTI (GOM)
RTI ACT 2005
RTI/SANAD
PIO/APIO
Vigilance
Chief Vigilance Officer
About MMRC Vigilance
Functions of the CVO
Vigilance Complaints
Notice
Contact Us
Vigilance Awareness Week
Contact Us
How to reach us
Compliance Officer & Company Secretary
Policies
RISK ASSESSMENT & MANAGEMENT POLICY
WHISTLE BLOWER POLICY
CORPORATE SOCIAL RESPONSIBILITY POLICY
Flash News
MMRC
Flash News
टाइम्स इनोव्हेटिव्ह मीडिया मिळाला मुंबई मेट्रो तीन च्या बाह्य जाहिरातींचा कंत्राट
Mumbai Metro Line 3 awards OOH Advertisement rights to Times Innovative Media Ltd (Times OOH) for 15 years
Supply, Installation and Commissioning of Queue Managers for Mumbai Metro Line-3, Mumbai
Supply, Installation, Testing and Commissioning of Material Storage Racks (Mobile Storage Compactors, Heavy Duty Longspan Storage System) for Mumbai Metro Line-3, Mumbai
Supply, Installation and Commissioning of Frisking Booth & Frisking Platform for Mumbai Metro Line-3, Mumbai
List of NOC's issued till 30.06.2024
Fresh NOC Checklist
Construction of Commercial Building at Kalbadevi (K2) on CS No. 663, 664, 665, 1/665, 666, 667, 669, 671 & 774 of Bhuleshwar Division in ‘C’ Ward for Rehabilitation of Metro Line 3 PAP’s at Kalbadevi & Girgaon
Supply, Installation, Testing and Commissioning of Material Storage Racks (Metal Shelving Racks) for Mumbai Metro Line-3, Mumbai
Supply, Installation, Testing and Commissioning of Material Storage Racks (Mobile Storage Compactors, Heavy Duty Longspan Storage System) for Mumbai Metro Line-3, Mumbai
Home
Addendum No 1
Addendum No 1
MMRC
Construction of residential cum commercial high-rise building at Kalbadevi CS No. 662 and 1/662 of Bhuleshwar division for rehabilitation of Metro Line-3 Project Affected Persons of Kalbadevi and Girgaon.
Language
Undefined
Part Design, Procurement and Part Supply, Installation, Testing and Commissioning of Ballastless Track on the Mainline from Aarey station (excluded) until BKC station (included) and Ballasted Track in the area of at-grade Aarey Station and in the Depot area of Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) and Procurement and Supply of Turnouts, Scissor Crossovers and Buffer Stops for the entire Mainline for Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) including Package 10 B.
Language
Undefined
Mumbai Metro Rail Corporation (MMRC) hereby invites bids from eligible bidders for “Hiring of Printers on rental basis for MMRC Project Office and Site Office for 03 years” at MMRCL.
Language
Undefined
Design, Manufacture, Supply, Installation, Testing & Commissioning and Comprehensive Maintenance Service” of Lot I: CNC Under Floor Wheel Lathe, and Lot II: Battery Operated Shunter.
Language
Undefined
Design, Manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation System & Environmental Control System between Mumbai Central (excluding) to Cuffe Parade (including) Stations. (Package: 15)
Language
Undefined
Design, Manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation System & Environmental Control System between BKC (excluding) to Mumbai Central (including) Stations. (Package: 15)
Language
Undefined
Supply, Installation, Commissioning and Maintenance of Project Management Software (Primavera P6 EPPM) for Mumbai Metro Line 3 (MML3)
Language
Undefined
Design, Fabrication, Supply and Erection of Pre-Engineered Steel Buildings for Stabling Yards at Aarey Depot of Mumbai Metro Line-3 (Colaba-Bandra-SEEPZ) Project
Language
Undefined
Supplying consumable materials and maintenance of Electrical installations at new project office building of MMRCL at BKC, Bandra (E) in Mumbai for 2 years (2018-2020)
Language
Undefined
Design, Manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation System & Environmental Control System between Aarey (including) to BKC (including) Stations
Language
Undefined
previous
1
2
3
4
5
6
7
8
9
next
MMRC
Recent News
mmrc
मुंबई मेट्रोच्या वाट्याला पाच टक्के निधी
+
25 Jul 2024
'मुंबई मेट्रो-३' चा जाहिरात परवाना खासगी कंपनीला ! १५ वर्षांचा करार
+
25 Jul 2024
मुंबई मेट्रोला बूस्टर
+
24 Jul 2024
मेट्रो का विज्ञापन अधिकार निजी कंपनी के पास
+
24 Jul 2024
मुंबई मेट्रो तीनच्या बाह्य जाहिरातीचा परवाना खासगी कंपनीला
+
24 Jul 2024
'मेट्रो ३'ला जाहिरातींतून मिळणार कोट्यवधी रुपये
+
24 Jul 2024