461 | Invitation for Bids for “Part Design, Procurement and Supply, Installation, Testing and Commissioning of ballastless Track on theMainline from Aarey station (excluded) until BKC station (included) and ballasted Track in the area of at-grade Aarey Station and in the Depot area, excluding the procurement and supply of the rail Fastener System for Mainline of Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) | Notice 10A | MM3-CBS-TWK-02 | 28/09/2018 | file |
462 | Invitation for Bids for “Part Design, Procurement and Supply, Installation, Testing and Commissioning of ballastless Track on the Mainline from BKC station (excluded) to Cuffe Parade station (included) excluding the procurement and supply of Head Hardened rail 60 E1 (UIC 60), 1080 grade HH, Turnouts, Scissor Crossovers and Buffer Stops for Mumbai Metro Line 3 (Colaba – Bandra – SEEPZ) | Notice 10B | MM3-CBS-TWK-02 | 28/09/2018 | file |
463 | Providing A/c & Non A/c Vehicles like Indica/Wagon R, Indigo, Swift dezire, Honda City, Innova, OR equivalent vehicles etc. on Monthly Rental Basis and on daily basis for year 2018-2019. | Notice | MMRCL/Admin/Rental Vehicle/2018/E-Tender | 25/09/2018 | file |
464 | Providing A/c & Non A/c Vehicles like Indica/Wagon R, Indigo, Swift dezire, Honda City, Innova, OR equivalent vehicles etc. on Monthly Rental Basis and on Daily basis for year 2018- 2019. | Tender | MMRCL/Admin/Rental Vehicle/2018/E-Tender | 25/09/2018 | file |
465 | Design, Fabrication, Supply and Erection of Pre-Engineered Steel Buildings for Stabling Yards at Aarey Depot of Mumbai Metro Line-3 (Colaba-Bandra-SEEPZ) Project | Addendum No 1 | MMRC/ML-3/Car Depot/PEB/2018 | 14/09/2018 | file |
466 | Civil Maintenance Contract for MMRCL’s New Office Building situated in E Block, Bandra Kurla Complex, Bandra (E), Mumbai | Notice | MMRC/Planning/New Office/CivilMC/NIT/18/03/2nd Call | 11/09/2018 | file |
467 | Civil Maintenance Contract for Rehabilitation & Resettlement (R&R) sites under Mumbai Metro Line-III of MMRCL | Notice | MMRC/Planning/R&R/CivilMC/NIT/18/05/2nd Call | 04/09/2018 | file |
468 | Supplying consumable materials and maintenance of Electrical installations at new project office building of MMRCL at BKC, Bandra (E) in Mumbai for 2 years (2018-2020) | Addendum No 1 | MMRC/Sys/Elect/New Project Office/AMC | 30/08/2018 | file |
469 | Design, Manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation System & Environmental Control System between Aarey (including) to BKC (including) Stations. | Addendum No 8 | MM3-CBS-TVE (Phase I) | 24/08/2018 | file |
470 | Design, Manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation System & Environmental Control System between Aarey (including) to BKC (including) Stations. | Addendum No 7 | MM3-CBS-TVE (Phase I) | 21/08/2018 | file |